The latch has two catches; the first loosely holds the connector on the cable, the second requires more pressure to close the connector tightly. The cable must be in the correct position for the connector to close properly.

3.Drive the two screws at the center points about halfway down; first on the latch side, then the hinge side.

4.Continue to tighten the screws a little at a time until fully tightened; no more than 15 inch-pounds (5.6 Nm) of torque.

Note: You can only pierce the cable once. Once pierced, the KwikLock connector must not be removed. This insures that the inner conductors are not exposed to the elements.

The system should now be properly terminated. You can now continue to install components on the system.

Figure 4: Proper Termination Connections

Addressing and Installing ArmorBlocks™

Addressing ArmorBlocks

An ArmorBlock permits you to give it a number “address” so that the controller network system can recognize its location and function. ArmorBlocks are used at vacuum hopper/receiver, pump, and alarm node locations.

ArmorBlock Address Ranges

The number range of ArmorBlock addresses are as follows:

01 to 32 — Vacuum hopper/receiver stations; use a leading zero for numbers 01 to 09.

33 to 44 — Pump stations

45 to 60 — Central purge valves

24-Pump, 128-Station Controller

Chapter 3: Installation

17

Page 18
Image 18
Sterling 882.00255.00 CV3-655 Addressing and Installing ArmorBlocks, Addressing ArmorBlocks, ArmorBlock Address Ranges