Toro 2600D Lift Arm Counterbalance Spring, Adjustments, Counterbalance Arm, Application, Page 7 ±

Models: 2600D 2300-D

1 186
Download 186 pages 43.39 Kb
Page 165
Image 165
Lift Arm Counterbalance Spring

Adjustments

CAUTION

Never install or work on the cutting units or lift arms with the traction unit engine running. Always stop the engine and re- move the key first.

Lift Arm Counterbalance Spring

WARNING

Use caution when tensioning springs as they are under heavy load. Do not move lift lever, cutting units can lower without the engine running.

1.Raise cutting units to relieve tension on the counter- balance springs.

2.Make sure machine is shut off and parking brake is set.

3.Remove cotter pin and clevis pin securing the spring shackle to the counterbalance arm. Do not remove the other clevis pin .

4.Move shackle up or down the counter balance arm until it aligns with the desired hole of the arm.

Counterbalance Arm

Application

Hole Position

 

 

 

Middle Hole

for 5 blade reels

 

 

Second Hole from Top

for 8 blade reels without

 

baskets

 

 

Top Hole

for 8 blade reels with

 

baskets

 

 

DO NOT REMOVE THESE PINS

3

2

4

1

 

 

Figure 5

1.

Clevis pin & cotter pin

3.

Counterbalance arm

2.

Spring Shackle

4.

Counterbalance spring

IMPORTANT: These are recommended settings. Readjust spring positions to attain optimum per- formance. By raising spring locations on counter- balance arms, cutting unit weight on ground is reduced and traction is increased.

5.Reinstall clevis pin through the desired hole, then attach cotter pin.

Cutting Units

Reelmaster 2300±D/2600±D

Page 7 ± 7

Cutting Units

Page 165
Image 165
Toro 2600D Lift Arm Counterbalance Spring, Adjustments, Make sure machine is shut off and parking brake is set, Page 7 ±