Operations

Load Ribbon

9. Bring the ribbon leader over the upper ribbon roller (1) and then toward the ribbon take-up spindle (2).

1 2

10.Wind the ribbon leader and attached ribbon counterclockwise around the ribbon take-up spindle.

11.Rotate the spindle counterclockwise several turns to wind the ribbon and remove any slack.

73

1/7/10

Xi4™/RXi4™ User Guide

P1009874-002

Page 73
Image 73
Zebra Technologies 11680100201, 14080100200, RXI4TM, 17080100200, 22080100000, 17280100000, 17080100000 manual Operations