TOOL ASSEMBLY
WARNING!
To reduce the risk of injury, always unplug tool before attaching or removing accessories or mak- ing adjustments. Use only specifically recom- mended accessories. Others may be hazardous.
Assembling Dymorigs &
For Cat. No. 4125 & 4130 only (Fig. 1).
Fig. 1
Handle
spoke
Cradle assembly
Column
Hex bolt
Base
Leveling screws (4)
Socket set | Column bolts |
screws (2) |
1.Set the base on the ground. Loosen the hex bolt and nut (wrench not supplied). Raise the column upright.
2.To core vertically or horizontally, insert the large column bolt (provided in separate accessory bag) through the bottom of column and into the base. Tighten hex bolt and nut (wrench not supplied).
To angle core, tilt the column to the desired angle and tighten the hex bolt and nut. Save the column bolt for future use when vertical or horizontal coring.
3.Tighten the two (2) black socket set screws located on the base with the supplied wrench.
4.Screw the four (4) handle spokes (provided in separate accessory bag) into the hub on the cradle assembly.
For Cat. No. 4115 & 4120 only (Fig. 2).
Fig. 2 | Cradle | |
assembly | ||
|
Handle spoke
| Column | |
Base | Leveling | |
screws (4) | ||
| ||
| Column | |
| bolts (2) | |
| Lock washers |
1.Set the base on the ground.
2.Remove two (2) bolts and two (2) lockwashers from accessory bag.
3.Place the column in the slot of the base.
4.Insert two (2) bolts and two (2) lockwashers and tighten securely. page 6
Moving the Handle to the Other Side
For Cat. Nos. 4125 & 4130 only (Fig. 3).
Fig. 3 | Bubble |
Socket | level Socket |
screws (4) | screw |
Ammeter gauge
Meter box
Cradle | Cradle |
| lock |
1.Tighten the cradle lock.
2.Loosen the socket head screw and remove the meter box.
3.Remove four (4) socket head screws holding the spoked handle housing.
4.Turn the assembly around 180°.
5.Replace the four (4) socket head screws and tighten securely.
6.Attach meter box to opposite side (see "Mounting the Meter Box"). For Cat. Nos. 4115 & 4120 only (Fig. 4).
Fig. 4 | Socket screw | |
and washer Socket | ||
| ||
| screw |
Ammeter gauge
Meter box
Cradle
1.Loosen the cradle lock.
2.Raise the cradle to the maximum height.
3.Lift the cradle an additional 1/2" by hand.
4.Tighten the cradle lock.
5.Loosen the socket head screw and remove the meter box.
6.Remove the meter box stud from the cradle.
7.Remove the screw and washer from the end of the pinion shaft.
8.Remove the handle and pinion shaft assembly.
9.Turn the assembly around 180° and insert into cradle.
10.Replace the screw and washer and tighten securely.
11.Replace the meter stud on the side opposite the handle.
12.Attach meter box to opposite side (see “Mounting the Meter Box”).
13.Loosen the cradle lock and lower the cradle until the pinion engages the rack.
14.Tighten the cradle lock.