Premier
Floors
manual
Field Fabrication Rake/Gable Walls
Install
Load Chart
Panel Basics - Assembly
Checklist
Page 14
Page 13
Page 15
Image 14
Page 13
Page 15
Contents
installation guide
Introduction
Table of Contents
PBS SIPs Tips
Do not put plumbing inside SIPs
Fill all voids with expanding foam
Storage & Handling
Checklist of Tools
Spline Connection
Lumber Connection
I-JoistConnection
Panel Basics - Assembly
Fasteners
Field Fabrication
Page
Field Fabrication Rake/Gable Walls
Floors
Page
PANEL TIP Stagger your panel placement with two panels on one side of the beam, four panels on the other side, and four back on the first side of the beam. This will help your beam stay straight
Sill Plates
Page
Walls
STEP 2. LAYOUT TRANSFER
STEP 3. PANEL TILT
STEP 4. ADJACENT PANEL
STEP 5. FASTENING
STEP 6. TOP PLATE
Headers
Page
Intermediate Floors
Page
Roofs
On the Ground
Lifting Panels
Page
Page
Insul-Lam
Electrical
Where walls terminate against a panel
you can drill at the horizontal electrical
Plumbing
Shearwalls
Premier Panel R-Values
Panel Core
Panel Core
Panel Span ft
Panel Core
Panel Core
Panel Core
Panel Core
Load Chart
Header
Header
Premier
Insul-BeamII
Header Loads
Load Chart
No. of
Panel
Panel
Minimum
Speed
Pressure Chart 1 of
Load Chart 12 Wind
Speed
Pressure Chart 2 of
Load Chart 12 Wind
Page
SOUTHWEST
REGIONAL FIELD OFFICES NORTHWEST
4609 70th Ave. East Fife, WA
3434 W. Papago St. Phoenix, AZ
Related pages
Troubleshooting for Belkin PM00781EA F5D8635-4
Specifications Especificaciones for Polk Audio 175i
Index of Symptom-to-FRU Error Message for Acer LISHIN SLS0335A19A54LF
SMI Master Mode AC Timing Diagrams for Marvel Group 88F6281
How to Navigate for Philips L06.1E AA
Installation Considerations for Multi-Tech Systems 7500
Q42953-2 Main Module Parts List D 7251-8 Board for Crown 460CSL
See Language Code List pg for JVC SR-MV50U
Where can I find the HP ProBook 6570b manual?
Find it Here
Top
Page
Image
Contents