Premier
Floors
manual
Fastening, Top Plate
Install
Load Chart
Panel Basics - Assembly
Checklist
Page 23
Page 22
Page 24
Image 23
Page 22
Page 24
Contents
installation guide
Introduction
Table of Contents
PBS SIPs Tips
Fill all voids with expanding foam
Do not put plumbing inside SIPs
Storage & Handling
Checklist of Tools
Spline Connection
Lumber Connection
I-JoistConnection
Panel Basics - Assembly
Field Fabrication
Fasteners
Page
Field Fabrication Rake/Gable Walls
Floors
Page
PANEL TIP Stagger your panel placement with two panels on one side of the beam, four panels on the other side, and four back on the first side of the beam. This will help your beam stay straight
Sill Plates
Page
Walls
STEP 3. PANEL TILT
STEP 2. LAYOUT TRANSFER
STEP 4. ADJACENT PANEL
STEP 6. TOP PLATE
STEP 5. FASTENING
Headers
Page
Intermediate Floors
Page
Roofs
Lifting Panels
On the Ground
Page
Page
Insul-Lam
Electrical
you can drill at the horizontal electrical
Where walls terminate against a panel
Plumbing
Shearwalls
Premier Panel R-Values
Panel Core
Panel Core
Panel Span ft
Panel Core
Panel Core
Panel Core
Panel Core
Load Chart
Header
Header
Load Chart
Insul-BeamII
Header Loads
Premier
No. of
Panel
Panel
Minimum
Speed
Pressure Chart 1 of
Load Chart 12 Wind
Speed
Pressure Chart 2 of
Load Chart 12 Wind
Page
3434 W. Papago St. Phoenix, AZ
REGIONAL FIELD OFFICES NORTHWEST
4609 70th Ave. East Fife, WA
SOUTHWEST
Related pages
Troubleshooting for Actiontec electronic HPE400T
Specifications for Black Box DVI-D Extender
Error Code/Symptom FRU/Action 5962 for IBM xSeries 330
Temperature Conversion Chart for Hotpoint C150E
Why do we have environmentally labelled computers? for Samsung KD17ASSS/EDC
Installation Instructions for Giant P420-0011
Parts List Description QTY for AllTrade 835446
Preset code list for Pioneer VSX-9130TXH-K
Installer checkoff list for KitchenAid 8301169
Can I cook sushi rice in a
Sanyo rice cooker
?
Top
Page
Image
Contents