Premier
Floors
manual
Spline Connection
Install
Load Chart
Panel Basics - Assembly
Checklist
Page 8
Page 7
Page 9
Image 8
Page 7
Page 9
Contents
installation guide
Introduction
Table of Contents
PBS SIPs Tips
Do not put plumbing inside SIPs
Fill all voids with expanding foam
Storage & Handling
Checklist of Tools
Spline Connection
Lumber Connection
I-JoistConnection
Panel Basics - Assembly
Fasteners
Field Fabrication
Page
Field Fabrication Rake/Gable Walls
Floors
Page
PANEL TIP Stagger your panel placement with two panels on one side of the beam, four panels on the other side, and four back on the first side of the beam. This will help your beam stay straight
Sill Plates
Page
Walls
STEP 2. LAYOUT TRANSFER
STEP 3. PANEL TILT
STEP 4. ADJACENT PANEL
STEP 5. FASTENING
STEP 6. TOP PLATE
Headers
Page
Intermediate Floors
Page
Roofs
On the Ground
Lifting Panels
Page
Page
Insul-Lam
Electrical
Where walls terminate against a panel
you can drill at the horizontal electrical
Plumbing
Shearwalls
Premier Panel R-Values
Panel Core
Panel Core
Panel Span ft
Panel Core
Panel Core
Panel Core
Panel Core
Load Chart
Header
Header
Insul-BeamII
Header Loads
Premier
Load Chart
No. of
Panel
Panel
Minimum
Speed
Pressure Chart 1 of
Load Chart 12 Wind
Speed
Pressure Chart 2 of
Load Chart 12 Wind
Page
REGIONAL FIELD OFFICES NORTHWEST
4609 70th Ave. East Fife, WA
SOUTHWEST
3434 W. Papago St. Phoenix, AZ
Related pages
Specifications for Peavey 0280305057
Error Message Reported Error for A.O. Smith GB/GW-500
Channel Schematic for Carvin SL40C
Refer to this section when changing the strings for Yamaha SVC110
Install the network connection for Philips BDP7500 MK II
Parts List for Life Fitness 828
Remote Code List for RCA M50WH186
Default Ethernet Negotiation Settings for ZyXEL Communications metrogigabit switch
Are there any optional kits in the
Rinnai EX17C manual
?
Top
Page
Image
Contents