Premier
Floors
manual
Install
Load Chart
Panel Basics - Assembly
Checklist
Page 27
Page 26
Page 28
Image 27
Page 26
Page 28
Contents
installation guide
Introduction
Table of Contents
PBS SIPs Tips
Fill all voids with expanding foam
Do not put plumbing inside SIPs
Storage & Handling
Checklist of Tools
Spline Connection
Lumber Connection
I-JoistConnection
Panel Basics - Assembly
Field Fabrication
Fasteners
Page
Field Fabrication Rake/Gable Walls
Floors
Page
PANEL TIP Stagger your panel placement with two panels on one side of the beam, four panels on the other side, and four back on the first side of the beam. This will help your beam stay straight
Sill Plates
Page
Walls
STEP 3. PANEL TILT
STEP 2. LAYOUT TRANSFER
STEP 4. ADJACENT PANEL
STEP 6. TOP PLATE
STEP 5. FASTENING
Headers
Page
Intermediate Floors
Page
Roofs
Lifting Panels
On the Ground
Page
Page
Insul-Lam
Electrical
you can drill at the horizontal electrical
Where walls terminate against a panel
Plumbing
Shearwalls
Premier Panel R-Values
Panel Core
Panel Core
Panel Span ft
Panel Core
Panel Core
Panel Core
Panel Core
Load Chart
Header
Header
Load Chart
Insul-BeamII
Header Loads
Premier
No. of
Panel
Panel
Minimum
Pressure Chart 1 of
Load Chart 12 Wind
Speed
Pressure Chart 2 of
Load Chart 12 Wind
Speed
Page
3434 W. Papago St. Phoenix, AZ
REGIONAL FIELD OFFICES NORTHWEST
4609 70th Ave. East Fife, WA
SOUTHWEST
Related pages
Troubleshooting Tips for Technicolor - Thomson TM9049
Specifications for Acu-Rite 613
Understanding error messages for Samsung J1060A(V/S)
Additional Workout Progress Charts for New Balance 5K 5100
Where to Place the Monitor for HP d8904
AUX300CE Module Installation for Heat & Glo LifeStyle 350TRSI-AUF
Replacement Parts List for Raypak 240692
Language code list for Samsung HT-TX715
Installation und Anschlüsse for Elta 2402N
How does the Kenwood BM210 compare to other bread makers?
Comparison guide
(/kenwood-bm210-manual)
Top
Page
Image
Contents