Premier
Floors
manual
Adjacent Panel
Install
Load Chart
Panel Basics - Assembly
Checklist
Page 22
Page 21
Page 23
Image 22
Page 21
Page 23
Contents
installation guide
Introduction
Table of Contents
PBS SIPs Tips
Do not put plumbing inside SIPs
Fill all voids with expanding foam
Storage & Handling
Checklist of Tools
Spline Connection
Lumber Connection
I-JoistConnection
Panel Basics - Assembly
Fasteners
Field Fabrication
Page
Field Fabrication Rake/Gable Walls
Floors
Page
PANEL TIP Stagger your panel placement with two panels on one side of the beam, four panels on the other side, and four back on the first side of the beam. This will help your beam stay straight
Sill Plates
Page
Walls
STEP 2. LAYOUT TRANSFER
STEP 3. PANEL TILT
STEP 4. ADJACENT PANEL
STEP 5. FASTENING
STEP 6. TOP PLATE
Headers
Page
Intermediate Floors
Page
Roofs
On the Ground
Lifting Panels
Page
Page
Insul-Lam
Electrical
Where walls terminate against a panel
you can drill at the horizontal electrical
Plumbing
Shearwalls
Premier Panel R-Values
Panel Core
Panel Core
Panel Span ft
Panel Core
Panel Core
Panel Core
Panel Core
Load Chart
Header
Header
Premier
Insul-BeamII
Header Loads
Load Chart
No. of
Panel
Panel
Minimum
Load Chart 12 Wind
Pressure Chart 1 of
Speed
Load Chart 12 Wind
Pressure Chart 2 of
Speed
Page
SOUTHWEST
REGIONAL FIELD OFFICES NORTHWEST
4609 70th Ave. East Fife, WA
3434 W. Papago St. Phoenix, AZ
Related pages
Troubleshooting & Repair for Lincoln Electric SVM173-A
Specifications InPro Intelligent Protocol Cameras for Speco Technologies InProTPD3
Error Messages for Acer X5400
2X Program Operation Flow Diagram for Samsung KFM2G16Q2A
HOW to Connect Your VCR for NordicTrack NTHK99902
Uninstall the Opos Driver for Zebra Technologies ZQ110
Headstock Controls Parts List for Southbend SB1012
Where can I find detailed
instructions for Daewoo microwaves
?
Top
Page
Image
Contents