Premier
Floors
manual
Panel Core
Install
Load Chart
Panel Basics - Assembly
Checklist
Page 43
Page 42
Page 44
Image 43
Page 42
Page 44
Contents
installation guide
Introduction
Table of Contents
PBS SIPs Tips
Fill all voids with expanding foam
Do not put plumbing inside SIPs
Storage & Handling
Checklist of Tools
Spline Connection
Lumber Connection
I-JoistConnection
Panel Basics - Assembly
Field Fabrication
Fasteners
Page
Field Fabrication Rake/Gable Walls
Floors
Page
PANEL TIP Stagger your panel placement with two panels on one side of the beam, four panels on the other side, and four back on the first side of the beam. This will help your beam stay straight
Sill Plates
Page
Walls
STEP 3. PANEL TILT
STEP 2. LAYOUT TRANSFER
STEP 4. ADJACENT PANEL
STEP 6. TOP PLATE
STEP 5. FASTENING
Headers
Page
Intermediate Floors
Page
Roofs
Lifting Panels
On the Ground
Page
Page
Insul-Lam
Electrical
you can drill at the horizontal electrical
Where walls terminate against a panel
Plumbing
Shearwalls
Premier Panel R-Values
Panel Core
Panel Core
Panel Span ft
Panel Core
Panel Core
Panel Core
Panel Core
Load Chart
Header
Header
Load Chart
Insul-BeamII
Header Loads
Premier
No. of
Panel
Panel
Minimum
Load Chart 12 Wind
Pressure Chart 1 of
Speed
Load Chart 12 Wind
Pressure Chart 2 of
Speed
Page
3434 W. Papago St. Phoenix, AZ
REGIONAL FIELD OFFICES NORTHWEST
4609 70th Ave. East Fife, WA
SOUTHWEST
Related pages
Troubleshooting for Bose 15/10
Product Specifications for Samsung YP-P2JARY
Error Codes and Alarms for Blodgett DFG-100
Schematic Weld Control PC BD ALL Codes G4108-1 PG 1 for Lincoln Electric SVM175-A
Hold the plug by the head when taking it out for LG Electronics W182CM TSN2
How to install on Windows XP system for BenQ G2000WD
Additional information Language code list for Pioneer DVR-640H-S
How do I set the communication protocol for my SPD-1000?
Discover here
Top
Page
Image
Contents