Premier
Floors
manual
Install
Load Chart
Panel Basics - Assembly
Checklist
Page 17
Page 16
Page 18
Image 17
Page 16
Page 18
Contents
installation guide
Introduction
Table of Contents
PBS SIPs Tips
Fill all voids with expanding foam
Do not put plumbing inside SIPs
Storage & Handling
Checklist of Tools
Spline Connection
Lumber Connection
I-JoistConnection
Panel Basics - Assembly
Field Fabrication
Fasteners
Page
Field Fabrication Rake/Gable Walls
Floors
Page
PANEL TIP Stagger your panel placement with two panels on one side of the beam, four panels on the other side, and four back on the first side of the beam. This will help your beam stay straight
Sill Plates
Page
Walls
STEP 3. PANEL TILT
STEP 2. LAYOUT TRANSFER
STEP 4. ADJACENT PANEL
STEP 6. TOP PLATE
STEP 5. FASTENING
Headers
Page
Intermediate Floors
Page
Roofs
Lifting Panels
On the Ground
Page
Page
Insul-Lam
Electrical
you can drill at the horizontal electrical
Where walls terminate against a panel
Plumbing
Shearwalls
Premier Panel R-Values
Panel Core
Panel Core
Panel Span ft
Panel Core
Panel Core
Panel Core
Panel Core
Load Chart
Header
Header
Header Loads
Insul-BeamII
Premier
Load Chart
No. of
Panel
Panel
Minimum
Speed
Pressure Chart 1 of
Load Chart 12 Wind
Speed
Pressure Chart 2 of
Load Chart 12 Wind
Page
4609 70th Ave. East Fife, WA
REGIONAL FIELD OFFICES NORTHWEST
SOUTHWEST
3434 W. Papago St. Phoenix, AZ
Related pages
All Placement page
Exigences demplacement for Whirlpool W10343810A
Removal and replacement procedures for HP QS020US
Lower Light Replacement for Dimplex 26
LOG Placement for Napoleon Grills GSS36N
Lamp Replacement for JVC HD-61G587
25 Ft. Extension /Replacement High-Pressure Hose for Karcher K 2.350
Replacement of the fuse for Furuno GD-1900C-BB
Placement in Your Home for Vision Fitness T9700 Runner's
HOW to Order Replacement Parts for Epic Fitness EPTL818040
Placement and Power Connection for Cisco Systems 15216 EDFA2
What is the purpose of the
HP calibration page
?
Top
Page
Image
Contents