Premier
Floors
manual
Plumbing
Install
Load Chart
Panel Basics - Assembly
Checklist
Page 35
Page 34
Page 36
Image 35
Page 34
Page 36
Contents
installation guide
Introduction
Table of Contents
PBS SIPs Tips
Fill all voids with expanding foam
Do not put plumbing inside SIPs
Storage & Handling
Checklist of Tools
Spline Connection
Lumber Connection
I-JoistConnection
Panel Basics - Assembly
Field Fabrication
Fasteners
Page
Field Fabrication Rake/Gable Walls
Floors
Page
PANEL TIP Stagger your panel placement with two panels on one side of the beam, four panels on the other side, and four back on the first side of the beam. This will help your beam stay straight
Sill Plates
Page
Walls
STEP 3. PANEL TILT
STEP 2. LAYOUT TRANSFER
STEP 4. ADJACENT PANEL
STEP 6. TOP PLATE
STEP 5. FASTENING
Headers
Page
Intermediate Floors
Page
Roofs
Lifting Panels
On the Ground
Page
Page
Insul-Lam
Electrical
you can drill at the horizontal electrical
Where walls terminate against a panel
Plumbing
Shearwalls
Premier Panel R-Values
Panel Core
Panel Core
Panel Span ft
Panel Core
Panel Core
Panel Core
Panel Core
Load Chart
Header
Header
Load Chart
Insul-BeamII
Header Loads
Premier
No. of
Panel
Panel
Minimum
Speed
Pressure Chart 1 of
Load Chart 12 Wind
Speed
Pressure Chart 2 of
Load Chart 12 Wind
Page
3434 W. Papago St. Phoenix, AZ
REGIONAL FIELD OFFICES NORTHWEST
4609 70th Ave. East Fife, WA
SOUTHWEST
Related pages
Troubleshooting Procedures for SUPER MICRO Computer X6DAT-G
Specifications for Elkay LK411A
Operating Error Messages for Socket Mobile GFK0121E
Diagnostic Code Chart Electronic Thermostat ET for Whirlpool 318686-000
HOW to USE Your Snow Thrower for Poulan 424053
Do not Install Your Dryer for Kenmore 134313400
Scheduled Replacement Parts List for Pecoware TBB-3000
Appendix B Country code list for parental lock for JVC TH-A10R
Be careful, the cleaned parts may still be hot for Philips SCF334
What accessories are available for KitchenAid KSB580?
Explore accessories
Top
Page
Image
Contents