Premier
Floors
manual
Panel Core
Install
Load Chart
Panel Basics - Assembly
Checklist
Page 38
Page 37
Page 39
Image 38
Page 37
Page 39
Contents
installation guide
Introduction
Table of Contents
PBS SIPs Tips
Do not put plumbing inside SIPs
Fill all voids with expanding foam
Storage & Handling
Checklist of Tools
Spline Connection
Lumber Connection
I-JoistConnection
Panel Basics - Assembly
Fasteners
Field Fabrication
Page
Field Fabrication Rake/Gable Walls
Floors
Page
PANEL TIP Stagger your panel placement with two panels on one side of the beam, four panels on the other side, and four back on the first side of the beam. This will help your beam stay straight
Sill Plates
Page
Walls
STEP 2. LAYOUT TRANSFER
STEP 3. PANEL TILT
STEP 4. ADJACENT PANEL
STEP 5. FASTENING
STEP 6. TOP PLATE
Headers
Page
Intermediate Floors
Page
Roofs
On the Ground
Lifting Panels
Page
Page
Insul-Lam
Electrical
Where walls terminate against a panel
you can drill at the horizontal electrical
Plumbing
Shearwalls
Premier Panel R-Values
Panel Core
Panel Core
Panel Span ft
Panel Core
Panel Core
Panel Core
Panel Core
Load Chart
Header
Header
Premier
Insul-BeamII
Header Loads
Load Chart
No. of
Panel
Panel
Minimum
Speed
Pressure Chart 1 of
Load Chart 12 Wind
Speed
Pressure Chart 2 of
Load Chart 12 Wind
Page
SOUTHWEST
REGIONAL FIELD OFFICES NORTHWEST
4609 70th Ave. East Fife, WA
3434 W. Papago St. Phoenix, AZ
Related pages
Troubleshooting for iHome IH-A706CW
Physical Specifications for HP dc7900
Description of Error Indication Codes for Sony MZ-NF610
Diagram 2 Internal View for Altinex UT250-101
When you want to check more for JVC LET0141-002A
Installing the Photoshop LE Macintosh for Minolta AF-2820U
Parts List a / Assembly Diagram for Harbor Freight Tools 93271
Language code list for RCA 27F500TDV
Edit the image using Reduce/Enlarge Rotate Move and press for Panasonic KX-PX20M
What should I do if my Vulcan griddle is damaged during shipping? Check the
Vulcan Griddle Manual
for instructions.
Top
Page
Image
Contents