Premier
Floors
manual
Pressure Chart 1 of, Load Chart 12 Wind, Speed
Install
Load Chart
Panel Basics - Assembly
Checklist
Page 53
Page 52
Page 54
Image 53
Page 52
Page 54
Contents
installation guide
Introduction
Table of Contents
PBS SIPs Tips
Fill all voids with expanding foam
Do not put plumbing inside SIPs
Storage & Handling
Checklist of Tools
Spline Connection
Lumber Connection
I-JoistConnection
Panel Basics - Assembly
Field Fabrication
Fasteners
Page
Field Fabrication Rake/Gable Walls
Floors
Page
PANEL TIP Stagger your panel placement with two panels on one side of the beam, four panels on the other side, and four back on the first side of the beam. This will help your beam stay straight
Sill Plates
Page
Walls
STEP 3. PANEL TILT
STEP 2. LAYOUT TRANSFER
STEP 4. ADJACENT PANEL
STEP 6. TOP PLATE
STEP 5. FASTENING
Headers
Page
Intermediate Floors
Page
Roofs
Lifting Panels
On the Ground
Page
Page
Insul-Lam
Electrical
you can drill at the horizontal electrical
Where walls terminate against a panel
Plumbing
Shearwalls
Premier Panel R-Values
Panel Core
Panel Core
Panel Span ft
Panel Core
Panel Core
Panel Core
Panel Core
Load Chart
Header
Header
Header Loads
Insul-BeamII
Premier
Load Chart
No. of
Panel
Panel
Minimum
Speed
Pressure Chart 1 of
Load Chart 12 Wind
Speed
Pressure Chart 2 of
Load Chart 12 Wind
Page
4609 70th Ave. East Fife, WA
REGIONAL FIELD OFFICES NORTHWEST
SOUTHWEST
3434 W. Papago St. Phoenix, AZ
Related pages
All Diagram page
Diagramme DE Câblage for Multiquip GB12BS
Lubrication Chart for Poulan 177552
Electrical Schematic for Scag Power Equipment SFZ36-17KA
Baking Problems and Solutions Chart for Frigidaire 318200439
Använda schemavy for Samsung UE40C8705
Before printing the Pantone Color chart for Tektronix 240
Schematic Diagrams for Fluke 5720A
Single Line Diagram Battery Operation for Mitsubishi Electronics 2033C
Food Charts for Sunbeam 4713
Console Diagram Features of the Console for ProForm PFEL73207.0
What audio connections are supported by the
Onkyo HT-R391
?
Top
Page
Image
Contents