Premier Floors manual Regional Field Offices Northwest, 4609 70th Ave. East Fife, WA, Southwest

Page 56
REGIONAL FIELD OFFICES

REGIONAL FIELD OFFICES

NORTHWEST

4609 70th Ave. East Fife, WA 98424 253-926-2020 800-275-7086

SOUTHWEST

3434 W. Papago St. Phoenix, AZ 85009 602-269-7266 800-240-6691

TECHNICAL CENTER 17001 Fish Point Rd. #101 Prior Lake, MN 55372 800-469-8870

Contact us for more information:

Website: www.pbssips.com

Email: info@pbssips.com

© 2008 Premier Building Systems Rev 1-08 #603757

Image 56
Contents installation guide Introduction Table of Contents PBS SIPs Tips Do not put plumbing inside SIPs Fill all voids with expanding foamStorage & Handling Checklist of Tools Spline Connection Lumber Connection I-JoistConnection Panel Basics - Assembly Fasteners Field FabricationPage Field Fabrication Rake/Gable Walls Floors Page PANEL TIP Stagger your panel placement with two panels on one side of the beam, four panels on the other side, and four back on the first side of the beam. This will help your beam stay straight Sill Plates Page Walls STEP 2. LAYOUT TRANSFER STEP 3. PANEL TILTSTEP 4. ADJACENT PANEL STEP 5. FASTENING STEP 6. TOP PLATEHeaders Page Intermediate Floors Page Roofs On the Ground Lifting PanelsPage Page Insul-Lam Electrical Where walls terminate against a panel you can drill at the horizontal electricalPlumbing Shearwalls Premier Panel R-Values Panel Core Panel Core Panel Span ft Panel Core Panel Core Panel Core Panel Core Load Chart Header Header Insul-BeamII Header LoadsPremier Load ChartNo. of Panel Panel Minimum Speed Pressure Chart 1 ofLoad Chart 12 Wind Speed Pressure Chart 2 ofLoad Chart 12 Wind Page REGIONAL FIELD OFFICES NORTHWEST 4609 70th Ave. East Fife, WASOUTHWEST 3434 W. Papago St. Phoenix, AZ