Premier
Floors
manual
Header
Install
Load Chart
Panel Basics - Assembly
Checklist
Page 47
Page 46
Page 48
Image 47
Page 46
Page 48
Contents
installation guide
Introduction
Table of Contents
PBS SIPs Tips
Fill all voids with expanding foam
Do not put plumbing inside SIPs
Storage & Handling
Checklist of Tools
Spline Connection
Lumber Connection
I-JoistConnection
Panel Basics - Assembly
Field Fabrication
Fasteners
Page
Field Fabrication Rake/Gable Walls
Floors
Page
PANEL TIP Stagger your panel placement with two panels on one side of the beam, four panels on the other side, and four back on the first side of the beam. This will help your beam stay straight
Sill Plates
Page
Walls
STEP 3. PANEL TILT
STEP 2. LAYOUT TRANSFER
STEP 4. ADJACENT PANEL
STEP 6. TOP PLATE
STEP 5. FASTENING
Headers
Page
Intermediate Floors
Page
Roofs
Lifting Panels
On the Ground
Page
Page
Insul-Lam
Electrical
you can drill at the horizontal electrical
Where walls terminate against a panel
Plumbing
Shearwalls
Premier Panel R-Values
Panel Core
Panel Core
Panel Span ft
Panel Core
Panel Core
Panel Core
Panel Core
Load Chart
Header
Header
Load Chart
Insul-BeamII
Header Loads
Premier
No. of
Panel
Panel
Minimum
Speed
Pressure Chart 1 of
Load Chart 12 Wind
Speed
Pressure Chart 2 of
Load Chart 12 Wind
Page
3434 W. Papago St. Phoenix, AZ
REGIONAL FIELD OFFICES NORTHWEST
4609 70th Ave. East Fife, WA
SOUTHWEST
Related pages
Troubleshooting and Maintenance Guide for HP SR5080CF
Specifications for Epson EB-Z8050W
List of Error Messages for Canon 2016
E1XP-400 Wiring Diagram for Napco Security Technologies XP-400
When the correct for Samsung MM-DG25T/UMG
Installing and removing the battery pack for Acer 1710 Series
Replacement Parts List for Panasonic cq-ja1070l
Language code List for LG Electronics BP120
Operation During Power Outage for Regency P40
Warranty Statement Regarding NON Authorized Repairs for Sylvania 6637LCT A
Where can I find troubleshooting tips for my
Asus VW223 monitor
?
Top
Page
Image
Contents