Your panels will usually arrive on a flatbed truck. Depending on the site, panels should be off-loaded to a clean, flat area with sufficient maneuvering room. (A fork-lift will speed the off-load process.)

Panels do not come in any particular order. This allows for minimized shipping costs by taking full advantage of the space available on the truck. It is advisable to sort the panels as you off load them. This process will require room to shift and stack the panels accordingly.

Sort and stack all of the panels by panel ID number and move them as close to their final location as possible. Place at least three stickers a maximum of 4’ on center (o.c.) under the panel stacks to ensure that the panels remain flat. The stickers should be a minimum of 3 ½” wide.

Inventory the panels as you off-load them. If one is missing or damaged call PBS immediately. We will work to correct the problem as soon as possible.

Remember, you are working with a wood product that may swell after prolonged exposure to moisture. Keep all panels and accessories protected from the elements prior to installation. If splines swell, installation may be hampered.

6

Image 6
Contents installation guide Introduction Table of Contents PBS SIPs Tips Do not put plumbing inside SIPs Fill all voids with expanding foamStorage & Handling Checklist of Tools Spline Connection Lumber Connection I-JoistConnection Panel Basics - Assembly Fasteners Field FabricationPage Field Fabrication Rake/Gable Walls Floors Page PANEL TIP Stagger your panel placement with two panels on one side of the beam, four panels on the other side, and four back on the first side of the beam. This will help your beam stay straight Sill Plates Page Walls STEP 2. LAYOUT TRANSFER STEP 3. PANEL TILTSTEP 4. ADJACENT PANEL STEP 5. FASTENING STEP 6. TOP PLATEHeaders Page Intermediate Floors Page Roofs On the Ground Lifting PanelsPage Page Insul-Lam Electrical Where walls terminate against a panel you can drill at the horizontal electricalPlumbing Shearwalls Premier Panel R-Values Panel Core Panel Core Panel Span ft Panel Core Panel Core Panel Core Panel Core Load Chart Header Header Premier Insul-BeamIIHeader Loads Load ChartNo. of Panel Panel Minimum Pressure Chart 1 of Load Chart 12 WindSpeed Pressure Chart 2 of Load Chart 12 WindSpeed Page SOUTHWEST REGIONAL FIELD OFFICES NORTHWEST4609 70th Ave. East Fife, WA 3434 W. Papago St. Phoenix, AZ