Cut your panel top plate to be continuous over the opening and at least 1’ past each end of the opening and 1’ from any panel joint. Install the top plate into the panel recess and over the header. Nail the top plate to the
Fur out both sides of the
Intermediate Floors
Platform Framing
In typical platform framing, the rim is placed on top of the panel, flush to the exterior, and the joists are placed on top of the panel.
(Floor joists can be either engineered wood or dimensional lumber. For more information, refer to the “Floor” section of this guide and the PBS detail section of our website at www.pbssips.com)
26