Premier
Floors
manual
Panel Core
Install
Load Chart
Panel Basics - Assembly
Checklist
Page 39
Page 38
Page 40
Image 39
Page 38
Page 40
Contents
installation guide
Introduction
Table of Contents
PBS SIPs Tips
Fill all voids with expanding foam
Do not put plumbing inside SIPs
Storage & Handling
Checklist of Tools
Spline Connection
Lumber Connection
I-JoistConnection
Panel Basics - Assembly
Field Fabrication
Fasteners
Page
Field Fabrication Rake/Gable Walls
Floors
Page
PANEL TIP Stagger your panel placement with two panels on one side of the beam, four panels on the other side, and four back on the first side of the beam. This will help your beam stay straight
Sill Plates
Page
Walls
STEP 3. PANEL TILT
STEP 2. LAYOUT TRANSFER
STEP 4. ADJACENT PANEL
STEP 6. TOP PLATE
STEP 5. FASTENING
Headers
Page
Intermediate Floors
Page
Roofs
Lifting Panels
On the Ground
Page
Page
Insul-Lam
Electrical
you can drill at the horizontal electrical
Where walls terminate against a panel
Plumbing
Shearwalls
Premier Panel R-Values
Panel Core
Panel Core
Panel Span ft
Panel Core
Panel Core
Panel Core
Panel Core
Load Chart
Header
Header
Load Chart
Insul-BeamII
Header Loads
Premier
No. of
Panel
Panel
Minimum
Pressure Chart 1 of
Load Chart 12 Wind
Speed
Pressure Chart 2 of
Load Chart 12 Wind
Speed
Page
3434 W. Papago St. Phoenix, AZ
REGIONAL FIELD OFFICES NORTHWEST
4609 70th Ave. East Fife, WA
SOUTHWEST
Related pages
Troubleshooting your computer for Acer 100 Series
Specifications for Woods Equipment SB84S
Error messages for Lenovo G40 Series
33 Tone Test Procedure/Connection Diagram for NEC NDA-24300
Why is Copy Tape blinking on the front panel? for Go-Video DDV9485
Parts List for Seymour Duncan 67372
Language Code and Country Code List for LG Electronics LHY-518
Lock Setting for Panasonic PV-GS16
Recovering using HP Recovery partition select models only for HP M6 1045DX B5S08UAR#ABA
Is it possible to use the delayed start feature on the Breville BBM800XL for oatmeal bread?
Learn how
Top
Page
Image
Contents