Premier
Floors
manual
No. of
Install
Load Chart
Panel Basics - Assembly
Checklist
Page 49
Page 48
Page 50
Image 49
Page 48
Page 50
Contents
installation guide
Introduction
Table of Contents
PBS SIPs Tips
Fill all voids with expanding foam
Do not put plumbing inside SIPs
Storage & Handling
Checklist of Tools
Spline Connection
Lumber Connection
I-JoistConnection
Panel Basics - Assembly
Field Fabrication
Fasteners
Page
Field Fabrication Rake/Gable Walls
Floors
Page
PANEL TIP Stagger your panel placement with two panels on one side of the beam, four panels on the other side, and four back on the first side of the beam. This will help your beam stay straight
Sill Plates
Page
Walls
STEP 3. PANEL TILT
STEP 2. LAYOUT TRANSFER
STEP 4. ADJACENT PANEL
STEP 6. TOP PLATE
STEP 5. FASTENING
Headers
Page
Intermediate Floors
Page
Roofs
Lifting Panels
On the Ground
Page
Page
Insul-Lam
Electrical
you can drill at the horizontal electrical
Where walls terminate against a panel
Plumbing
Shearwalls
Premier Panel R-Values
Panel Core
Panel Core
Panel Span ft
Panel Core
Panel Core
Panel Core
Panel Core
Load Chart
Header
Header
Header Loads
Insul-BeamII
Premier
Load Chart
No. of
Panel
Panel
Minimum
Load Chart 12 Wind
Pressure Chart 1 of
Speed
Load Chart 12 Wind
Pressure Chart 2 of
Speed
Page
4609 70th Ave. East Fife, WA
REGIONAL FIELD OFFICES NORTHWEST
SOUTHWEST
3434 W. Papago St. Phoenix, AZ
Related pages
Wired Ethernet Troubleshooting for RCA TM580
Specifications for Panasonic RP-HC300
Parameters, the switch now returns an error message for Allied Telesis AR700
File name becomes Part of the chart for Miller Electric TS
How to fasten the antenna cable for Furuno SC-50
Install a Support Brace, If Necessary for Hunter Fan 42654-01
PARTS LISTS FOR VENTING KITS AND COMPONENTS for Desa (V)V36P-B SERIES, VV36PC1 SERIES
Language Code List for Samsung MAX-DC650T/CDM
Image solution for Atlona AT-VGA180AS
Downflow Installation for Bryant 310AAV
What is included in the
Craftsman 10'' table saw parts list
?
Top
Page
Image
Contents