Premier Floors manual Premier Panel R-Values

Page 37
Premier Panel R-Values

Premier Panel R-Values

Type I modified EPS core

Core

R-Value

R-Value

Thickness

at 75˚

at 40˚

 

 

 

3-1/2”

15

16

 

 

 

5 -1/2”

23

24

 

 

 

7-1/4”

30

31

 

 

 

9-1/4”

38

39

 

 

 

11-1/4”

46

47

 

 

 

37

Image 37
Contents installation guide Introduction Table of Contents PBS SIPs Tips Fill all voids with expanding foam Do not put plumbing inside SIPsStorage & Handling Checklist of Tools Spline Connection Lumber Connection I-JoistConnection Panel Basics - Assembly Field Fabrication FastenersPage Field Fabrication Rake/Gable Walls Floors Page PANEL TIP Stagger your panel placement with two panels on one side of the beam, four panels on the other side, and four back on the first side of the beam. This will help your beam stay straight Sill Plates Page Walls STEP 3. PANEL TILT STEP 2. LAYOUT TRANSFERSTEP 4. ADJACENT PANEL STEP 6. TOP PLATE STEP 5. FASTENINGHeaders Page Intermediate Floors Page Roofs Lifting Panels On the GroundPage Page Insul-Lam Electrical you can drill at the horizontal electrical Where walls terminate against a panelPlumbing Shearwalls Premier Panel R-Values Panel Core Panel Core Panel Span ft Panel Core Panel Core Panel Core Panel Core Load Chart Header Header Header Loads Insul-BeamIIPremier Load ChartNo. of Panel Panel Minimum Load Chart 12 Wind Pressure Chart 1 ofSpeed Load Chart 12 Wind Pressure Chart 2 ofSpeed Page 4609 70th Ave. East Fife, WA REGIONAL FIELD OFFICES NORTHWESTSOUTHWEST 3434 W. Papago St. Phoenix, AZ