Premier
Floors
manual
Premier Panel R-Values
Install
Load Chart
Panel Basics - Assembly
Checklist
Page 37
Page 36
Page 38
Image 37
Page 36
Page 38
Contents
installation guide
Introduction
Table of Contents
PBS SIPs Tips
Fill all voids with expanding foam
Do not put plumbing inside SIPs
Storage & Handling
Checklist of Tools
Spline Connection
Lumber Connection
I-JoistConnection
Panel Basics - Assembly
Field Fabrication
Fasteners
Page
Field Fabrication Rake/Gable Walls
Floors
Page
PANEL TIP Stagger your panel placement with two panels on one side of the beam, four panels on the other side, and four back on the first side of the beam. This will help your beam stay straight
Sill Plates
Page
Walls
STEP 3. PANEL TILT
STEP 2. LAYOUT TRANSFER
STEP 4. ADJACENT PANEL
STEP 6. TOP PLATE
STEP 5. FASTENING
Headers
Page
Intermediate Floors
Page
Roofs
Lifting Panels
On the Ground
Page
Page
Insul-Lam
Electrical
you can drill at the horizontal electrical
Where walls terminate against a panel
Plumbing
Shearwalls
Premier Panel R-Values
Panel Core
Panel Core
Panel Span ft
Panel Core
Panel Core
Panel Core
Panel Core
Load Chart
Header
Header
Header Loads
Insul-BeamII
Premier
Load Chart
No. of
Panel
Panel
Minimum
Load Chart 12 Wind
Pressure Chart 1 of
Speed
Load Chart 12 Wind
Pressure Chart 2 of
Speed
Page
4609 70th Ave. East Fife, WA
REGIONAL FIELD OFFICES NORTHWEST
SOUTHWEST
3434 W. Papago St. Phoenix, AZ
Related pages
ENG Trouble Shooting for NextBase SDV37-SD
English Torque Specifications for Buhler FK303
Warmer drawer indicator light for Kenmore 790.4107
Parts Diagram for Smooth Fitness 7.1HR
How to Define the Model Suffix Ntsc or PAL model for Panasonic DMC-TZ3EE
Custom Installation for HP BP20
Parts List for Desa VP5D
Selecting languages using the language code list for Pioneer DV-373-S
Mode manuel for Hamilton Beach 33958
How to use paired key panic functions effectively?
Find out more
(#)
Top
Page
Image
Contents