Premier Floors manual Insul-BeamII, Header Loads, Premier, Load Chart

Page 48
Header Loads

48

No. of

Deflection

 

 

Header Span (ft.)

 

 

Trimmer Studs

 

2’

3’

4’

5’

6’

7’

8’

 

L/480

3150

2100

1575

1260

1050

900

788

1

 

 

 

 

 

 

 

 

L/360

3150

2100

1575

1260

1050

900

788

 

 

 

 

 

 

 

 

 

 

L/240

3150

2100

1575

1260

1050

900

788

 

 

 

 

 

 

 

 

 

 

L/480

6300

4200

3150

2520

2100

1800

1545

2

 

 

 

 

 

 

 

 

L/360

6300

4200

3150

2520

2100

1800

1575

 

 

 

 

 

 

 

 

 

 

L/240

6300

4200

3150

2520

2100

1800

1575

 

 

 

 

 

 

 

 

 

Header Loads

Load Chart 9:

(plf)

Premier

 

Insul-Beam II

Image 48
Contents installation guide Introduction Table of Contents PBS SIPs Tips Do not put plumbing inside SIPs Fill all voids with expanding foamStorage & Handling Checklist of Tools Spline Connection Lumber Connection I-JoistConnection Panel Basics - Assembly Fasteners Field FabricationPage Field Fabrication Rake/Gable Walls Floors Page PANEL TIP Stagger your panel placement with two panels on one side of the beam, four panels on the other side, and four back on the first side of the beam. This will help your beam stay straight Sill Plates Page Walls STEP 2. LAYOUT TRANSFER STEP 3. PANEL TILTSTEP 4. ADJACENT PANEL STEP 5. FASTENING STEP 6. TOP PLATEHeaders Page Intermediate Floors Page Roofs On the Ground Lifting PanelsPage Page Insul-Lam Electrical Where walls terminate against a panel you can drill at the horizontal electricalPlumbing Shearwalls Premier Panel R-Values Panel Core Panel Core Panel Span ft Panel Core Panel Core Panel Core Panel Core Load Chart Header Header Insul-BeamII Header LoadsPremier Load ChartNo. of Panel Panel Minimum Pressure Chart 1 of Load Chart 12 WindSpeed Pressure Chart 2 of Load Chart 12 WindSpeed Page REGIONAL FIELD OFFICES NORTHWEST 4609 70th Ave. East Fife, WASOUTHWEST 3434 W. Papago St. Phoenix, AZ