Premier
Floors
manual
Fasteners, Field Fabrication
Install
Load Chart
Panel Basics - Assembly
Checklist
Page 12
Page 11
Page 13
Image 12
Page 11
Page 13
Contents
installation guide
Introduction
Table of Contents
PBS SIPs Tips
Do not put plumbing inside SIPs
Fill all voids with expanding foam
Storage & Handling
Checklist of Tools
Spline Connection
Lumber Connection
I-JoistConnection
Panel Basics - Assembly
Fasteners
Field Fabrication
Page
Field Fabrication Rake/Gable Walls
Floors
Page
PANEL TIP Stagger your panel placement with two panels on one side of the beam, four panels on the other side, and four back on the first side of the beam. This will help your beam stay straight
Sill Plates
Page
Walls
STEP 2. LAYOUT TRANSFER
STEP 3. PANEL TILT
STEP 4. ADJACENT PANEL
STEP 5. FASTENING
STEP 6. TOP PLATE
Headers
Page
Intermediate Floors
Page
Roofs
On the Ground
Lifting Panels
Page
Page
Insul-Lam
Electrical
Where walls terminate against a panel
you can drill at the horizontal electrical
Plumbing
Shearwalls
Premier Panel R-Values
Panel Core
Panel Core
Panel Span ft
Panel Core
Panel Core
Panel Core
Panel Core
Load Chart
Header
Header
Insul-BeamII
Header Loads
Premier
Load Chart
No. of
Panel
Panel
Minimum
Pressure Chart 1 of
Load Chart 12 Wind
Speed
Pressure Chart 2 of
Load Chart 12 Wind
Speed
Page
REGIONAL FIELD OFFICES NORTHWEST
4609 70th Ave. East Fife, WA
SOUTHWEST
3434 W. Papago St. Phoenix, AZ
Related pages
Troubleshooting for Acer VD.T25V7.001
Specifications for Runco PL-50XA
Paper loading error messages for HP Z5200 CQ113A#B1K
Wiring Diagram for Hubbell Electric Heater Company CE110
HOW to Connect Your Home Stereo for NordicTrack NTTL18901
Installation for Aiwa NSX-AJ50
Parts List Side and Rear Panel Assembly for Country Home Products DR
Language code list for Toshiba HD-A1
Settings for Samsung SM-R600NZBAXEH
Specifications for Aiphone JB-2HD
Reversing Motor Mount Assembly for American Dryer Corp AD-25V
What functions do the BIOS modes serve in Intel Desktop Boards?
Understand BIOS modes
Top
Page
Image
Contents