Premier
Floors
manual
Sill Plates
Install
Load Chart
Panel Basics - Assembly
Checklist
Page 18
Page 17
Page 19
Image 18
Page 17
Page 19
Contents
installation guide
Introduction
Table of Contents
PBS SIPs Tips
Do not put plumbing inside SIPs
Fill all voids with expanding foam
Storage & Handling
Checklist of Tools
Spline Connection
Lumber Connection
I-JoistConnection
Panel Basics - Assembly
Fasteners
Field Fabrication
Page
Field Fabrication Rake/Gable Walls
Floors
Page
PANEL TIP Stagger your panel placement with two panels on one side of the beam, four panels on the other side, and four back on the first side of the beam. This will help your beam stay straight
Sill Plates
Page
Walls
STEP 2. LAYOUT TRANSFER
STEP 3. PANEL TILT
STEP 4. ADJACENT PANEL
STEP 5. FASTENING
STEP 6. TOP PLATE
Headers
Page
Intermediate Floors
Page
Roofs
On the Ground
Lifting Panels
Page
Page
Insul-Lam
Electrical
Where walls terminate against a panel
you can drill at the horizontal electrical
Plumbing
Shearwalls
Premier Panel R-Values
Panel Core
Panel Core
Panel Span ft
Panel Core
Panel Core
Panel Core
Panel Core
Load Chart
Header
Header
Premier
Insul-BeamII
Header Loads
Load Chart
No. of
Panel
Panel
Minimum
Pressure Chart 1 of
Load Chart 12 Wind
Speed
Pressure Chart 2 of
Load Chart 12 Wind
Speed
Page
SOUTHWEST
REGIONAL FIELD OFFICES NORTHWEST
4609 70th Ave. East Fife, WA
3434 W. Papago St. Phoenix, AZ
Related pages
Care and Cleaning Troubleshooting for GE JRS0624
Specifications for LG Electronics BP730
Error Code for Dell R720XD
Circuit Diagram for Migmatic 253 400 VAC for Miller Electric OM-229 038D
How to Access the Web-based Utility for Cisco Systems BEFSR41
How to Install Cisco Unified MeetingPlace Express for Cisco Systems MCS 7825
Parts List Price for Graco 7420
Code list for Fujitsu MBA3300RC
What is the PART Partial Reset for TM-V71E?
Discover the details
Top
Page
Image
Contents