Premier
Floors
manual
Install
Load Chart
Panel Basics - Assembly
Checklist
Page 25
Page 24
Page 26
Image 25
Page 24
Page 26
Contents
installation guide
Introduction
Table of Contents
PBS SIPs Tips
Fill all voids with expanding foam
Do not put plumbing inside SIPs
Storage & Handling
Checklist of Tools
Spline Connection
Lumber Connection
I-JoistConnection
Panel Basics - Assembly
Field Fabrication
Fasteners
Page
Field Fabrication Rake/Gable Walls
Floors
Page
PANEL TIP Stagger your panel placement with two panels on one side of the beam, four panels on the other side, and four back on the first side of the beam. This will help your beam stay straight
Sill Plates
Page
Walls
STEP 3. PANEL TILT
STEP 2. LAYOUT TRANSFER
STEP 4. ADJACENT PANEL
STEP 6. TOP PLATE
STEP 5. FASTENING
Headers
Page
Intermediate Floors
Page
Roofs
Lifting Panels
On the Ground
Page
Page
Insul-Lam
Electrical
you can drill at the horizontal electrical
Where walls terminate against a panel
Plumbing
Shearwalls
Premier Panel R-Values
Panel Core
Panel Core
Panel Span ft
Panel Core
Panel Core
Panel Core
Panel Core
Load Chart
Header
Header
Header Loads
Insul-BeamII
Premier
Load Chart
No. of
Panel
Panel
Minimum
Load Chart 12 Wind
Pressure Chart 1 of
Speed
Load Chart 12 Wind
Pressure Chart 2 of
Speed
Page
4609 70th Ave. East Fife, WA
REGIONAL FIELD OFFICES NORTHWEST
SOUTHWEST
3434 W. Papago St. Phoenix, AZ
Related pages
Troubleshooting Guide GAS Ovens for Lincoln 1117-080-A
Specifications for Onkyo TX-DS898
Status Indicator Lights for Frigidaire 1000
Power Take-Off Diagrams for Harbor Freight Tools 67853
Things to Watch Out for When Taking Pictures for Samsung EC-ES75ZZBPOE3
Installing a CSS 11503 as a Rackmounted Unit for Cisco Systems 11500 Series
Parts list for Lenovo X61 Tablet
VCR Code List for JVC GR-DVL105
Configuring predefined signatures for Fortinet 100A
Features for Master Bilt MTD-06
Are there
instructions for adjusting the gas regulator on Generac generators
?
Top
Page
Image
Contents