Premier
Floors
manual
Minimum
Install
Load Chart
Panel Basics - Assembly
Checklist
Page 52
Page 51
Page 53
Image 52
Page 51
Page 53
Contents
installation guide
Introduction
Table of Contents
PBS SIPs Tips
Do not put plumbing inside SIPs
Fill all voids with expanding foam
Storage & Handling
Checklist of Tools
Spline Connection
Lumber Connection
I-JoistConnection
Panel Basics - Assembly
Fasteners
Field Fabrication
Page
Field Fabrication Rake/Gable Walls
Floors
Page
PANEL TIP Stagger your panel placement with two panels on one side of the beam, four panels on the other side, and four back on the first side of the beam. This will help your beam stay straight
Sill Plates
Page
Walls
STEP 2. LAYOUT TRANSFER
STEP 3. PANEL TILT
STEP 4. ADJACENT PANEL
STEP 5. FASTENING
STEP 6. TOP PLATE
Headers
Page
Intermediate Floors
Page
Roofs
On the Ground
Lifting Panels
Page
Page
Insul-Lam
Electrical
Where walls terminate against a panel
you can drill at the horizontal electrical
Plumbing
Shearwalls
Premier Panel R-Values
Panel Core
Panel Core
Panel Span ft
Panel Core
Panel Core
Panel Core
Panel Core
Load Chart
Header
Header
Insul-BeamII
Header Loads
Premier
Load Chart
No. of
Panel
Panel
Minimum
Load Chart 12 Wind
Pressure Chart 1 of
Speed
Load Chart 12 Wind
Pressure Chart 2 of
Speed
Page
REGIONAL FIELD OFFICES NORTHWEST
4609 70th Ave. East Fife, WA
SOUTHWEST
3434 W. Papago St. Phoenix, AZ
Related pages
Troubleshooting for Kyocera FS-1010
RTC Battery Specification for Acer 4252
Indicator Lights for Amana ND-68
BLOCK DIAGRAM - DSP VIEW for Life Fitness 95T
HOW to Assemble for Sanitaire 880 Series
Installation for Quick Eagle Networks DL3800E
RAI L Assembly Parts List for Craftsman 39535006
Additional information Language code list for Pioneer HTZ353DVD
Operation and Maintenance for Roberts Gorden HE-125
How do I replace the
kitchenaid double oven light bulb replacement
?
Top
Page
Image
Contents