Premier
Floors
manual
Electrical
Install
Load Chart
Panel Basics - Assembly
Checklist
Page 33
Page 32
Page 34
Image 33
Page 32
Page 34
Contents
installation guide
Introduction
Table of Contents
PBS SIPs Tips
Fill all voids with expanding foam
Do not put plumbing inside SIPs
Storage & Handling
Checklist of Tools
Spline Connection
Lumber Connection
I-JoistConnection
Panel Basics - Assembly
Field Fabrication
Fasteners
Page
Field Fabrication Rake/Gable Walls
Floors
Page
PANEL TIP Stagger your panel placement with two panels on one side of the beam, four panels on the other side, and four back on the first side of the beam. This will help your beam stay straight
Sill Plates
Page
Walls
STEP 3. PANEL TILT
STEP 2. LAYOUT TRANSFER
STEP 4. ADJACENT PANEL
STEP 6. TOP PLATE
STEP 5. FASTENING
Headers
Page
Intermediate Floors
Page
Roofs
Lifting Panels
On the Ground
Page
Page
Insul-Lam
Electrical
you can drill at the horizontal electrical
Where walls terminate against a panel
Plumbing
Shearwalls
Premier Panel R-Values
Panel Core
Panel Core
Panel Span ft
Panel Core
Panel Core
Panel Core
Panel Core
Load Chart
Header
Header
Header Loads
Insul-BeamII
Premier
Load Chart
No. of
Panel
Panel
Minimum
Pressure Chart 1 of
Load Chart 12 Wind
Speed
Pressure Chart 2 of
Load Chart 12 Wind
Speed
Page
4609 70th Ave. East Fife, WA
REGIONAL FIELD OFFICES NORTHWEST
SOUTHWEST
3434 W. Papago St. Phoenix, AZ
Related pages
Troubleshooting for Samsung UE32EH4000WXBT
Speaker Specifications for Shure 810
11. Error codes for Brother BAS-311E
Weight Resistance Chart for Weider WESY59100
HERE’S HOW to GET Help for Multiquip DCA-56SPX
Installation Procedure on Windows95/98 for Sony RMO-S551
Parts List for United States Stove 5510
Language code list for Panasonic DMR-ES30V
To change how the contents of an album are displayed for LG Electronics P999
PIN 7. External Alarm NC for Swann 4 CH Digital Video Recorder
How do I save a song on my
Alesis Performance Pad Pro
?
Top
Page
Image
Contents