Premier
Floors
manual
On the Ground, Lifting Panels
Install
Load Chart
Panel Basics - Assembly
Checklist
Page 29
Page 28
Page 30
Image 29
Page 28
Page 30
Contents
installation guide
Introduction
Table of Contents
PBS SIPs Tips
Fill all voids with expanding foam
Do not put plumbing inside SIPs
Storage & Handling
Checklist of Tools
Spline Connection
Lumber Connection
I-JoistConnection
Panel Basics - Assembly
Field Fabrication
Fasteners
Page
Field Fabrication Rake/Gable Walls
Floors
Page
PANEL TIP Stagger your panel placement with two panels on one side of the beam, four panels on the other side, and four back on the first side of the beam. This will help your beam stay straight
Sill Plates
Page
Walls
STEP 3. PANEL TILT
STEP 2. LAYOUT TRANSFER
STEP 4. ADJACENT PANEL
STEP 6. TOP PLATE
STEP 5. FASTENING
Headers
Page
Intermediate Floors
Page
Roofs
Lifting Panels
On the Ground
Page
Page
Insul-Lam
Electrical
you can drill at the horizontal electrical
Where walls terminate against a panel
Plumbing
Shearwalls
Premier Panel R-Values
Panel Core
Panel Core
Panel Span ft
Panel Core
Panel Core
Panel Core
Panel Core
Load Chart
Header
Header
Header Loads
Insul-BeamII
Premier
Load Chart
No. of
Panel
Panel
Minimum
Speed
Pressure Chart 1 of
Load Chart 12 Wind
Speed
Pressure Chart 2 of
Load Chart 12 Wind
Page
4609 70th Ave. East Fife, WA
REGIONAL FIELD OFFICES NORTHWEST
SOUTHWEST
3434 W. Papago St. Phoenix, AZ
Related pages
2TROUBLESHOOTING for Lincoln Electric SP-255
Specifications for Samsung VR330S
Indicator light identification for Samsung EO-IG930BWEGRU
Electric Interface Board Diagnostic Chart for Frymaster Ultimate Electric Series
Why Do We Process Personal Data? for Nokia 300
Installing a Non-Redundant Power Supply for Dell T410
Parts List for Friedrich MC24Y3F
Language Code List for Sylvania DVL100C
What is Covered Limited ONE-YEAR Warranty for Avanti WCR683DZD-1
Using pointing devices for HP CQ71-420SB
What are the technical specifications for the Onix model?
View the full details here
Top
Page
Image
Contents