Premier Floors manual On the Ground, Lifting Panels

Page 29
On the Ground

On the Ground

Prior to lifting, install as many of your dimensional lumber splines and I-joist splines as possible along the connecting sides of each roof panel. Premier splines should be installed as panels are installed. The dimensional lumber at the ridge and eaves should be installed after the panels are set in place. (If panels are perpendicular to the ridge.)

Cut a bevel block out of dimensional lumber to the same pitch as the roof and fasten the full length of the ridge. The roof panel must bear at least 11/2” on the beveled block. Next, tack SIP Tape that is 18” wide on top of the ridge beam. (Be sure that the release paper is facing up towards the underside of the roof panels.)

Lifting Panels

Use either a picking eye or strap method to lift your roof panels. (A lifting apparatus can be fashioned from a 4” eye made from 3/4” steel rod.) The shaft should be at least 14” long. The nut should be tack welded to a minimum 4” diameter washer made of 1/2” thick steel.

29

Image 29
Contents installation guide Introduction Table of Contents PBS SIPs Tips Fill all voids with expanding foam Do not put plumbing inside SIPsStorage & Handling Checklist of Tools Spline Connection Lumber Connection I-JoistConnection Panel Basics - Assembly Field Fabrication FastenersPage Field Fabrication Rake/Gable Walls Floors Page PANEL TIP Stagger your panel placement with two panels on one side of the beam, four panels on the other side, and four back on the first side of the beam. This will help your beam stay straight Sill Plates Page Walls STEP 3. PANEL TILT STEP 2. LAYOUT TRANSFERSTEP 4. ADJACENT PANEL STEP 6. TOP PLATE STEP 5. FASTENINGHeaders Page Intermediate Floors Page Roofs Lifting Panels On the GroundPage Page Insul-Lam Electrical you can drill at the horizontal electrical Where walls terminate against a panelPlumbing Shearwalls Premier Panel R-Values Panel Core Panel Core Panel Span ft Panel Core Panel Core Panel Core Panel Core Load Chart Header Header Header Loads Insul-BeamIIPremier Load ChartNo. of Panel Panel Minimum Speed Pressure Chart 1 ofLoad Chart 12 Wind Speed Pressure Chart 2 ofLoad Chart 12 Wind Page 4609 70th Ave. East Fife, WA REGIONAL FIELD OFFICES NORTHWESTSOUTHWEST 3434 W. Papago St. Phoenix, AZ