Premier
Floors
manual
Header
Install
Load Chart
Panel Basics - Assembly
Checklist
Page 46
Page 45
Page 47
Image 46
Page 45
Page 47
Contents
installation guide
Introduction
Table of Contents
PBS SIPs Tips
Do not put plumbing inside SIPs
Fill all voids with expanding foam
Storage & Handling
Checklist of Tools
Spline Connection
Lumber Connection
I-JoistConnection
Panel Basics - Assembly
Fasteners
Field Fabrication
Page
Field Fabrication Rake/Gable Walls
Floors
Page
PANEL TIP Stagger your panel placement with two panels on one side of the beam, four panels on the other side, and four back on the first side of the beam. This will help your beam stay straight
Sill Plates
Page
Walls
STEP 2. LAYOUT TRANSFER
STEP 3. PANEL TILT
STEP 4. ADJACENT PANEL
STEP 5. FASTENING
STEP 6. TOP PLATE
Headers
Page
Intermediate Floors
Page
Roofs
On the Ground
Lifting Panels
Page
Page
Insul-Lam
Electrical
Where walls terminate against a panel
you can drill at the horizontal electrical
Plumbing
Shearwalls
Premier Panel R-Values
Panel Core
Panel Core
Panel Span ft
Panel Core
Panel Core
Panel Core
Panel Core
Load Chart
Header
Header
Premier
Insul-BeamII
Header Loads
Load Chart
No. of
Panel
Panel
Minimum
Load Chart 12 Wind
Pressure Chart 1 of
Speed
Load Chart 12 Wind
Pressure Chart 2 of
Speed
Page
SOUTHWEST
REGIONAL FIELD OFFICES NORTHWEST
4609 70th Ave. East Fife, WA
3434 W. Papago St. Phoenix, AZ
Related pages
Troubleshooting for Quantum Instruments Cascade Laser Starter Kit
Specifications for NEC NDRV-62
If there is an error message on your for Dell 5150C
GXT500/550/565 Series Quick Reference Chart for Midland Radio GXT565
When using HDD/DVD for Hitachi DZ-HS3OOA
Du måste starta om datorn för att slutföra installationen for Samsung YP-Z5FQW/XEE
Parts List for Desa VDCFTPB
Selecting languages using the language code list for Pioneer S-DV740
Setting up for Sigma QUick Infrared Camera
USB port x disabled for Lexmark M5163DN
How do Flex Groups operate on the
Mackie TT24
?
Top
Page
Image
Contents