Insul-Lam is used as a non-structural nail base in either a one or two layer system.

Two-Layer System – Begin by installing the 2x dimensional lumber dam around the perimeter of the roof. The height of the dam is determined by the depth of Insul-Lam being installed. In residential applications, PBS recommends the use of a vapor retarder with either the one or two layer systems. You will need to cut one 2’ x 4’ foam section and enough 2’ x 8’ foam sections from your shipment to ring the perimeter flush to your lumber dam.

Once the 2’ sections are in place, layout the remaining 4’ x 8’ foam sheets.

Top Layer – Apply the nail base top layer perpendicular to the foam layer so that joints overlap. You will need to remove 11/2” of foam along the edges of your perimeter course so the OSB overlaps your lumber dam. Once an Insul-Lam top sheet is in position, fasten the assembly to the deck with Premier Panel Screws following the spacing and frequency determined by engineering. Penetrate the structural deck to a depth of at least 1”. Along the perimeter

32

Image 32
Contents installation guide Introduction Table of Contents PBS SIPs Tips Do not put plumbing inside SIPs Fill all voids with expanding foamStorage & Handling Checklist of Tools Spline Connection Lumber Connection I-JoistConnection Panel Basics - Assembly Fasteners Field FabricationPage Field Fabrication Rake/Gable Walls Floors Page PANEL TIP Stagger your panel placement with two panels on one side of the beam, four panels on the other side, and four back on the first side of the beam. This will help your beam stay straight Sill Plates Page Walls STEP 2. LAYOUT TRANSFER STEP 3. PANEL TILTSTEP 4. ADJACENT PANEL STEP 5. FASTENING STEP 6. TOP PLATEHeaders Page Intermediate Floors Page Roofs On the Ground Lifting PanelsPage Page Insul-Lam Electrical Where walls terminate against a panel you can drill at the horizontal electricalPlumbing Shearwalls Premier Panel R-Values Panel Core Panel Core Panel Span ft Panel Core Panel Core Panel Core Panel Core Load Chart Header Header Insul-BeamII Header LoadsPremier Load ChartNo. of Panel Panel Minimum Speed Pressure Chart 1 ofLoad Chart 12 Wind Speed Pressure Chart 2 ofLoad Chart 12 Wind Page REGIONAL FIELD OFFICES NORTHWEST 4609 70th Ave. East Fife, WASOUTHWEST 3434 W. Papago St. Phoenix, AZ