STEP 2. LAYOUT TRANSFER

Using a black marker, transfer the panel layouts to the bottom plate. Include all window and door openings as well as the vertical electrical chases in each wall panel. If electrical chases are being utilized, drill the chase holes as you set each panel using a minimum 11/2” bit. (Do not drill all the chase holes down the entire wall, because as panel joints grow you will be off center as you get to the end of the wall.)

STEP 3. PANEL TILT

Determine the best place to start the installation and get your panels to that area. Most of the time it is best to start in a building corner. The corners are locked together using Premier Panel Screws secured through the panel spaced 2’ o.c. maximum. (Normally you will use a screw two inches longer than the wall thickness.) Install the screws into the panel close to the lumber plate. Use a drill to finish tightening and the panels will cinch together. Set the underside of the screw heads flush with the OSB, do not break the skin of the panel. Always check the fastening or engineering schedule on your shop drawings.

21

Image 21
Contents installation guide Introduction Table of Contents PBS SIPs Tips Fill all voids with expanding foam Do not put plumbing inside SIPsStorage & Handling Checklist of Tools Spline Connection Lumber Connection I-JoistConnection Panel Basics - Assembly Field Fabrication FastenersPage Field Fabrication Rake/Gable Walls Floors Page PANEL TIP Stagger your panel placement with two panels on one side of the beam, four panels on the other side, and four back on the first side of the beam. This will help your beam stay straight Sill Plates Page Walls STEP 3. PANEL TILT STEP 2. LAYOUT TRANSFERSTEP 4. ADJACENT PANEL STEP 6. TOP PLATE STEP 5. FASTENINGHeaders Page Intermediate Floors Page Roofs Lifting Panels On the GroundPage Page Insul-Lam Electrical you can drill at the horizontal electrical Where walls terminate against a panelPlumbing Shearwalls Premier Panel R-Values Panel Core Panel Core Panel Span ft Panel Core Panel Core Panel Core Panel Core Load Chart Header Header Header Loads Insul-BeamIIPremier Load ChartNo. of Panel Panel Minimum Pressure Chart 1 of Load Chart 12 WindSpeed Pressure Chart 2 of Load Chart 12 WindSpeed Page 4609 70th Ave. East Fife, WA REGIONAL FIELD OFFICES NORTHWESTSOUTHWEST 3434 W. Papago St. Phoenix, AZ