Use the long point of one panel to establish the short point of the next adjoining panel. Add a small amount to this measurement to allow for the required 1/8” gap as determined by the roof pitch factor. Continue on to the ridge or highest point. After all rake walls are erected, small adjustments can be made to make the plane of the rake flat: either plane off the high spots on the rake panel skins and re-cut the foam, or just raise the plate slightly to get a straight line along the rake/gable.

Recesses can be melted out of the foam when the foam cutter is placed perpendicular to the skin and the depth gauge is set to 1-1/2”.

Make sure to blow out the loose foam with an air nozzle or scrape the recess out before installing splines.

ALL FLOOR, WALL AND ROOF PANELS CAN BE FIELD CUT USING THE PRINCIPLES DESCRIBED HEREIN. DIRECT ANY QUESTIONS TO YOUR SALES PROFESSIONAL OR THE PREMIER LOCATION NEAREST YOU.

Floors

Before placing panels, pre-assemble the dimensional lumber, or I-joists, and install them into the edge recesses along the leading edge of the panel. Use 5’ bar clamps (if necessary) to help pull twisted lumber flush to the panel edges. Nail both sides of the panel 6” o.c.

Premier splines can be installed as you set each floor panel. They should be placed on the trailing edge of the installed panel. The Premier splines should be placed into the recesses as the panels are being installed. Apply Premier Mastic as described in the connection section.

15

Image 15
Contents installation guide Introduction Table of Contents PBS SIPs Tips Fill all voids with expanding foam Do not put plumbing inside SIPsStorage & Handling Checklist of Tools Spline Connection Lumber Connection I-JoistConnection Panel Basics - Assembly Field Fabrication FastenersPage Field Fabrication Rake/Gable Walls Floors Page PANEL TIP Stagger your panel placement with two panels on one side of the beam, four panels on the other side, and four back on the first side of the beam. This will help your beam stay straight Sill Plates Page Walls STEP 3. PANEL TILT STEP 2. LAYOUT TRANSFERSTEP 4. ADJACENT PANEL STEP 6. TOP PLATE STEP 5. FASTENINGHeaders Page Intermediate Floors Page Roofs Lifting Panels On the GroundPage Page Insul-Lam Electrical you can drill at the horizontal electrical Where walls terminate against a panelPlumbing Shearwalls Premier Panel R-Values Panel Core Panel Core Panel Span ft Panel Core Panel Core Panel Core Panel Core Load Chart Header Header Load Chart Insul-BeamIIHeader Loads PremierNo. of Panel Panel Minimum Pressure Chart 1 of Load Chart 12 WindSpeed Pressure Chart 2 of Load Chart 12 WindSpeed Page 3434 W. Papago St. Phoenix, AZ REGIONAL FIELD OFFICES NORTHWEST4609 70th Ave. East Fife, WA SOUTHWEST