Premier
Floors
manual
Panel
Install
Load Chart
Panel Basics - Assembly
Checklist
Page 50
Page 49
Page 51
Image 50
Page 49
Page 51
Contents
installation guide
Introduction
Table of Contents
PBS SIPs Tips
Do not put plumbing inside SIPs
Fill all voids with expanding foam
Storage & Handling
Checklist of Tools
Spline Connection
Lumber Connection
I-JoistConnection
Panel Basics - Assembly
Fasteners
Field Fabrication
Page
Field Fabrication Rake/Gable Walls
Floors
Page
PANEL TIP Stagger your panel placement with two panels on one side of the beam, four panels on the other side, and four back on the first side of the beam. This will help your beam stay straight
Sill Plates
Page
Walls
STEP 2. LAYOUT TRANSFER
STEP 3. PANEL TILT
STEP 4. ADJACENT PANEL
STEP 5. FASTENING
STEP 6. TOP PLATE
Headers
Page
Intermediate Floors
Page
Roofs
On the Ground
Lifting Panels
Page
Page
Insul-Lam
Electrical
Where walls terminate against a panel
you can drill at the horizontal electrical
Plumbing
Shearwalls
Premier Panel R-Values
Panel Core
Panel Core
Panel Span ft
Panel Core
Panel Core
Panel Core
Panel Core
Load Chart
Header
Header
Premier
Insul-BeamII
Header Loads
Load Chart
No. of
Panel
Panel
Minimum
Speed
Pressure Chart 1 of
Load Chart 12 Wind
Speed
Pressure Chart 2 of
Load Chart 12 Wind
Page
SOUTHWEST
REGIONAL FIELD OFFICES NORTHWEST
4609 70th Ave. East Fife, WA
3434 W. Papago St. Phoenix, AZ
Related pages
Troubleshooting for NETGEAR WG121
Specifications for Orion Car Audio 200
Timeouts and error messages for AT&T ATT1856
Setup Menu Flow Charts for Russound CAM6.6X-S1/S2
Terminating the Shared Scsi Bus when Using UltraSCSI Hubs for Compaq AA-RHGWB-TE
First Time Installation for Sharp LC-32SH340E
Parts List For The JSG-96 Sander Disc Sander Assembly for Jet Tools JSG-96
Language Code List for Samsung HT-TX500T/XSV
Navigating the setup menu for Samsung DVD-H1080W
Where can I find troubleshooting tips for the Pioneer dex p9?
Check here
Top
Page
Image
Contents