Wayne-Dalton 3663-372 installation instructions Installing Battery, Pre-Operation

Page 29

 

Mounting Wall Station

Lower Screw Installation

 

Upper Screw Installation

 

 

 

 

 

 

 

 

 

 

 

(Continued)

 

 

 

 

 

 

 

 

 

 

 

If mounting to a NEMA electrical device box,

 

 

 

 

 

 

 

use machine thread screws provided in

 

 

 

 

 

 

 

place of the wood screws. No drilling is

 

 

 

 

 

 

 

required. If high voltage wiring is contained

 

 

 

 

 

 

 

in the box, a standard NEMA solid faceplate

 

 

 

 

 

 

 

must be installed between the box and the

 

 

 

 

 

 

 

wall station. If fastening into drywall or

 

 

 

 

 

 

 

concrete, use anchors provided. When

 

 

 

 

 

 

 

mounting to wood use a 3/32" drill bit and

 

 

 

 

Phillips

 

the drilling template located on page 44.

 

 

 

 

 

 

 

 

Head Screw

 

Drill the two 3/32” mounting holes using the

 

 

 

 

 

 

 

drill template. Drill 3/16" holes if using

 

 

 

 

 

 

 

anchors.

 

 

 

 

 

 

 

Install lower screw leaving 7/16" of the

 

 

 

 

 

 

 

screw exposed. Slide wall station keyhole

 

 

 

 

 

 

 

slot onto the lower phillips head screw. Wall

 

7/16”

 

 

 

 

 

station should slide onto screw, providing a

 

 

 

 

 

 

 

snug fit. If necessary remove wall station

 

 

 

 

 

 

 

and loosen or tighten lower phillips head

 

 

 

Keyhole

 

 

 

screw until a snug fit is achieved.

 

 

 

Slot

 

 

 

 

 

 

 

 

 

 

Once wall station is fitted on lower screw,

 

 

 

Phillips

 

 

 

install upper screw. Do not over-tighten.

 

 

 

 

 

 

 

 

 

 

Head Screw

 

 

 

CAUTION: OVER-TIGHTENING THE UPPER

 

 

 

 

 

 

 

SCREW COULD DEFORM PLASTIC CASE.

 

 

 

 

 

 

15

Installing Battery

 

per

 

 

 

 

 

 

 

 

 

 

 

 

 

O

at

 

 

 

 

 

 

o

e

 

 

 

Tools Needed:

Remove the battery cover (right-hand side

 

T

 

 

 

LED

o

 

 

 

 

 

 

D

 

 

 

 

of wall station) by disengaging the battery

 

 

o

 

 

 

 

Press

 

 

 

None

 

 

Here

r

 

 

 

 

 

 

 

 

cover’s lower clip.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Install two AAA batteries into the wall

 

 

 

 

 

 

 

station observing the polarity, (+) and (-),

 

 

 

 

 

 

 

of both batteries. After about three seconds,

Wall

 

 

 

 

 

 

the red LED will begin to blink momentarily

 

 

 

 

 

 

Station

 

 

 

 

 

every three seconds.

 

 

 

 

 

Battery

 

 

 

 

 

 

 

 

Re-install the battery cover by first inserting

 

 

 

 

 

Cover

 

 

 

 

 

 

 

 

its top into the wall station then inserting

 

 

 

(2) AAA

 

Lower

 

and securing its bottom.

 

 

 

 

 

 

 

 

Batteries

 

Clip

 

Apply entrapment warning label in a

 

 

 

 

 

 

 

convenient location next to the wall station.

 

 

 

 

 

 

 

Use mechanical fasteners if adhesive will

 

 

 

 

 

 

 

not adhere.

 

Entrapment

 

 

 

 

 

 

 

Label

 

 

 

 

 

NOTE: To slow blink rate or turn off the red

 

 

 

per

 

 

LED, refer to wall station operation page 34

 

 

 

 

 

 

 

 

O

at

 

 

 

 

 

T

D

 

 

 

 

 

 

o

e

 

 

 

 

 

 

 

 

 

“Backlit LED Light”.

 

 

 

 

o

 

 

 

 

Press

 

 

 

 

 

 

 

o

 

 

 

 

 

 

Here

r

 

 

 

 

 

 

 

Please Do Not Return This Product To The Store. Call Us Directly! Our Trained Technicians Will Answer Your Questions and/or Ship Any Parts You May Need. 22 You can reach us Toll Free at 1-888-827-3667 for Consumer Assistance or online at www.wayne-dalton.com

PRE-OPERATION

Image 29
Contents Copyright 2008 Wayne-Dalton Corp Rev 7 7/16/2008 Important NoticeSecurity arm manually locks Idrive mounts to Lift cables raise doorCounterbalance above door From bottom Closed door Package Contents Look for this symbol When Installing a NEW Door with AN IdriveEyes to Prevent Possible Severe or Fatal Injury Pre-InstallationInspection Tools Needed System RequirementsWAYNE-DALTON Track Radius Photoelectric LOW Head 10,12,14,15Definition of key words used in this manual Table of ContentsSpring Tension Removal Retro-Fit InstallationDrum Wrap & End Bracket RemovalTorquemaster Plus End Bracket RemovalRemoval Center Bracket & Cable DrumRetro-Fit Installation End Bracket Removal RETRO-FIT TorquemasterVertical Track Height Adjustment Re-Install If NecessaryTop Bracket 8000/8100/8200 TrackTop Roller Adjustment RETRO-FIT InstallationsFailure to RE-ATTACH Horizontal Tracks to the Support Before Opening Door can Cause DoorAssembling Opener InstallationIdrive for Torquemaster InstallationCable Drums Brackets End BracketsCable Drum/ Drive Gear InstallationIdrive for Torquemaster Installation Counterbalance Springs End Bracket InstallationPositioning Support Bracket InstallationAttaching Opener To Support BracketPliers Attaching Disconnect CableSlack between opener and right end PliersMounting Disconnect Pilot drill lag screw location using 1/8 drill bitHandle Bracket 6ftDisconnect Attaching Disconnect HandleDisconnect Handle Usage Aligned and Seated Cable AdjustmentsTools Needed Vice Clamps Securing DoorFor Spring Winding Hands Winding SpringsIMPORTANT! do not Overwind Springs Drum Wrap InstallationRecommended Spring Turns Tools Needed Step LadderIMPORTANT! do not Overwind Setting Spring TensionGarage Door Mounting Wall StationPRE-OPERATION Installing BatteryInstalling the Light Fixture Attaching Diffuser Connecting OpenerPower Cord Sensor Unit Photoelectric Eyes are notFor Proper Alignment View of the Opener from the Front Sensor Wire InstallationChecking for Obstructions Safety Sensor AlignmentSecuring the Opener Programming Light Fixture On when program button is pushedProfile Routine Standard Upper Limit On and remain on for 30 secondsProfile Routine Adjusting DetentCustom Upper Limit Work ProperlyOperation Lock Arm InstallationContact Obstruction Test Lock Arm InstallationFatal Injury MAY Result Testing the Safety SensorsDoor activation Read and Follow ALL InstructionsEmergency Disconnect Never GO Under a STOPPED, Partially Open DoorOperating the Wireless Wall Station Teaching HomeLink to the idrive opener Programming/Training HomeLink UnitOperation Custom pet position Customizing the SettingsMulti-Door Programming For more profile options go to page 28Maintenance Confirm pot nut position* shown below Power Connection Permanent Wiring OptionReconnect Power OPENER, Using the Emergency Stations or Transmitters to OpenerProgramming Wireless WallProgramming Remote Controls Disconnect Handle Prior toSymptom Probable Cause Corrective Action TroubleshootingTroubleshootingoperation Lock Arm TroubleshootingDalton dealer or distributor Pre-drill 3/32 pilot hole Cut-Out Template to Aid InstallationDrill Template Pre-drill 5/64 pilot holePatent Information