Henny Penny 680 KFC manual

Page 10

1.Cut and remove the metal bands from the carton.

2.Remove the carton lid and lift the main carton off the fryer.

3.Remove corner packing supports (4).

4.Cut and remove the metal bands holding- the fryer to the

Do not unlatch the lid before completion of steps 5,6, and 7.

5. Remove the fryer from the pallet. See page 2-3.

The fryer weighs approximately 600 lbs. (270 Kg). Extreme care should be taken when moving the fryer to prevent personal injury.

6.Remove rear cover.

The weights for the counterweight are shipped in a separate box under the unit.

7.Load the Counterweight Assembly. See page 2-4.

8.Replace rear cover.

9.Cut warning tags from the lid assembly. The lid may now be unlatched.

10.Prepare the deadweight valve for operation.

The metal shipping support is placed inside the deadweight valve housing to protect the orifice and weight during shipment. This support must be removed prior to installation and start-up.

A. Unthread the top cap.

B . Remove the round weight.

Image 10
Contents Page Specifications Henny Penny 8 Head GAS Pressure FryerPage Page Limited Warranty for Henny Penny Appliances Introduction Section Pressure IntroductionPressure Fryer HeatPage Page Page Prop UP a Ramp for Each Caster on the Selected Side Insert Page Page Page ALL STR N Unit again after installation Shortening MAY Start UP Procedure Lever Is not to be Pulled Page Page Push handle back and raise lid Cool Mode Switches IndicatorsLo Mode Melt Cycle OperationHeat Light will illuminate whenever the control calls for Page Refer to KFC’s Standards Library on cleaning instructions Page 397 Connecw Hj i’.,‘i ,e.*f Page Product Color Not Correct Too Dark Spotted Rancid Taste Shortening Too old Pressure will not Eplace pressure plate Replace module Heating of shortening too slow Or boil Water Shortening Ing over Gasket coming out of lid Pressure System Page Page Pump Position Check from Page Pressure Regulation Complete ControlPanel Henny Penny Every 90 daysPage Page Page LID Counterweight CONT’D Pressure PADLID Adjustment Hertz Page Seat ReplacementSolenoid Valve Operating Control ValveSafety Valve Do not Manuallyactivate the SafetyRemoval & Cleaning Operating ControlPressure Gauge Do not Disassemble or Modify this VavleCalibration Steps Page Page Page Page Page Page Page Page Page Using 3/8 socket, remove nut securing ground wire If no red glow is seen, proceed with the following Page Page Page Epyg-ui nuebq plea ewy Page Page Page Page Product One Units Part PER Number Description AssyLatch Plate PANEL, Right Side Page Not Avail Page Cable Counterweight BARPart PER Number Description CarriageHenny Penny Model 1005 LID Instruction Label LinkageassemblyUnits Part PER Number Description Assy CAM Slide FillerPage 705 Page Pressure Gauge Dead WeightFitting Connector Pipe ELBOW, 1/4Page BRACKET, HI-LIMIT LINK, Drain RODSUPPORT, Drain ROD HI-LIMITPage Units Smooth and Rounded Edge of Blade COVER, Coil Housing Solenoid ValveassemblyCORE, Disc Assembly HOUSING, CoilHead GAS Cooker I I SIE IAy--4A-+-7 Henny Penny Model 501 Henny Penny Model 501 Henny Penny Model 501 Henny Penny Model 501 IfApplicable SMS ProgrammingCode After the load compensation, press and release the Func Review Usage SMS Special ProgramMode Mode Reset UsageFactory Presets F/C, Gas/Electric, Speaker Volume Speaker Frequency, Codes, Initialize SystemAppliance Test Tech I/O ModeHeat Control Press and release the Function button and MELT, Mode