GE ZVC36, ZVC42, ZVC48, ZVC30 Duct Fittings, Flexible ducting, Do not use flexible plastic ducting

Page 10

Advance Planning

DUCT FITTINGS

This Hood Must Use an

8Round Duct. It Can

Transition to a

3-1/4x 12Duct.

Use this chart to compute maximum permissible lengths for duct runs to outdoors.

NOTE: Do not exceed maximum permissible equivalent lengths!

Maximum duct length: 100 foot for range hoods.

Flexible ducting:

If flexible metal ducting is used, all the equivalent feet values in the table should be doubled.

The flexible metal duct should be straight and smooth and extended as much as possible.

DO NOT use flexible plastic ducting.

NOTE: Any home ventilation system, such as a ventilation hood, may interrupt the proper flow of combustion air and exhaust required by fireplaces, gas furnaces, gas water heaters and other naturally vented systems. To minimize the chance of interruption of such naturally vented systems, follow the heating equipment manufacturer’s guidelines and safety standards such as those published by NFPA and ASHRAE.

 

 

 

 

Total

 

 

Equivalent

Quantity

Equivalent

Duct Piece

Dimensions

Length*

Used

Length

 

Round,

1 ft .

 

 

 

straight

(per foot

 

 

 

 

length)

 

 

 

3-1/4x 12

1 ft .

 

 

 

straight

(per foot

 

 

 

 

length)

 

 

 

90° elbow

17 ft .

 

 

 

 

 

 

 

45° elbow

10 ft .

 

 

 

 

 

 

 

3-1⁄4x 12

 

 

 

 

90° elbow

43 ft .

 

 

 

3-1/4x 12

 

 

 

 

45° elbow

26 ft .

 

 

 

3-1/4x 12

 

 

 

 

90° flat elbow

102 ft .

 

 

 

8round to

 

 

 

 

3-1/4x 12transition

2 ft .

 

 

 

3-1/4x 12to 8

 

 

 

 

round transition

5 ft .

 

 

 

8round

 

 

 

 

to 3-1/4x 12

 

 

 

 

transition 90° elbow

6 ft .

 

 

 

3-1/4x 12to 8

 

 

 

 

round transition 90° elbow

13 ft .

 

 

 

Round

 

 

 

 

wall cap

 

 

 

 

with damper

32 ft .

 

 

 

3-1/4x 12wall cap

 

 

 

 

with damper

75 ft .

 

 

 

Round

 

 

 

 

roof cap

44 ft .

 

 

*Actual length of straight duct plus duct fitting

equivalent . Equivalent length of duct pieces are

based on actual tests conducted by GE Evaluation Total Duct Run Engineering and reflect requirements for good

venting performance with any ventilation hood.

10

Image 10
Contents Installation Instructions For Monogram Parts and Accessories, call Installation InstructionsFor Monogram local service in your area, call Read these instructions completely and carefullyNever Pick UP a Flaming PAN-You may be burned OBSERVETHEFOLLOWINGaUse an extinguisher only if Design Information ContentsProduct Clearances Product Dimensions ZVC3034-1/2 ″ ZVC36Insert Sleeve 40-1/2″ ZVC4239-1/2″ 21-1/4″ZVC48 46-1/2″Advance Planning Power SupplyAdvance Planning Flexible ducting Duct FittingsDo not use flexible plastic ducting Remove the Packaging Installation PreparationTools and Materials Required Open hood carton Remove the liner, foam and cardboardRemote Mounting of the Control Wired Check Installation HardwareParts Provided Above bottom edge of insert sleeve Wall Installation PreparationDUCTWORK, Wiring Locations Ceiling ductingPlan the Location of the Hood and Ductwork Island Installation PreparationInstallation height Center Cooktop Countertop Front viewRemote Mounting of the Control Wired Remote Location for ControlWall Mounting CountertopCutout opening BracketInstall Hood Liner Verify that power is turned off at the source Connect ElectricalInstall Insert Sleeve Install Damper Plate BoltsConnect Wiring Harness Install Blower MotorWiring Install Filters Finalize InstallationLisez ces instructions entièrement et attentivement Instructions d’installationMise EN Garde Pour une Délai d’exécution 1 à 3 heuresAvertissement Pour Réduire Feu doux ou moyenTable DES Matières Information de conceptionDégagements Dimensions DE L’APPAREIL 4 po 34-1/2 po Dimensions et spécifications en pouces Dimensions externes 8 po 46-1/2 po 38-1/2 po 13 po Planification PlanificationAlimentation Électrique Raccords DE Conduits ’UTILISEZ PAS de conduit en plastique flexiblePréparation pour l’installation Retrait DE L’EMBALLAGEPièces Fournies Vérification DU Matériel D’INSTALLATIONMontage DES Commandes À Distance Câblées Localisez les pièces emballées avec la hotteET DU Câblage Préparation du mur pour l’installationConduit de ventilation de plafond Préparation pour l’installation en îlot De cuisson Comptoir Vue frontalePositionnement DES Commandes À Distance Montage DES Commandes À Distance CâbléesAvertissement Coupez Montage Mural ComptoirRemontez les languettes sur Etape 1 Installation DE LA Doublure DE LA Hotte Fixez la doublure au meuble à l’aide des 6 vis fourniesAvertissement Si le câblage Etape 3 Installation DE LA Gaine DE Hotte Encastrable Etape 4 Installation DU Registre À Guillotine Etape 5 Installation DES Moteurs DE Ventilateurs Etape 6 Connexion DU Faisceau ÉlectriqueEtape 8 Finalisation DE ’INSTALLATION Etape 7 Installation DES FiltresRetirez le film protecteur des filtres Page RLea estas instrucciones por completo y con detenimiento Instrucciones de instalaciónTiempo de finalización de 1 a 3 horas SOBREUNAESTUFA,CUMPLACONLOSSIGUIENTESPUNTOSª Nunca Levante UNA Sartén EN LLAMAS-Usted puede quemarseEspacios DEL Producto Información de diseñoContenidos 30″ mínimo requerido 36″ máximo recomendado 36″ minRevestimiento a medida Dimensiones DEL ProductoEl revestimiento provisto Ubicación remota del controlZVC36 39-1/2″ La funda del encastreZVC48 ADVERTENCIAUna conexión Planificación previaSuministro DE Energía Accesorios Para Conductos AshraeQuite EL Envoltorio Precaución Use guantes para protegerse de lados afiladosControle LAS Piezas DE Instalación Preparación para la instalaciónPiezas Provistas Montaje Remoto DEL Control CON CablesUbicaciones DE LOS Conductos Y Cableado Preparación para la instalación en paredConductos en el cielorraso Preparación para la instalación en isla Ubicación Remota DEL Control Advertencia Desconecte laMontaje Remoto DEL Control CON Cables PrincipalAplique silicona alrededor de la abertura Mostrador DE EncimeraColoque el control dentro de la abertura Paso 1 Instale EL Revestimiento DE LA Campana Encuadre la abertura para que entre el revestimientoPaso 2 Conecte LA Electricidad ADVERTENCIASi el cableadoPaso 3 Instale LA Funda DEL Encastre Nota El conducto doméstico debe ubicarse aPaso 4 Instale LA Placa DEL Regulador DE Tiro Paso 5 Instale EL Motor DEL Ventilador Paso 6 Conecte EL Arnés DE CableadoPaso 8 Finalice LA Instalación Paso 7 Instale LOS FiltrosQuite la película protectora de los filtros Gancho Notas Notas GE Consumer & Industrial