GE ZVC30, ZVC42, ZVC48, ZVC36 Remote Mounting of the Control Wired, Remote Location for Control

Page 15

Installation Preparation

REMOTE MOUNTING OF THE CONTROL – WIRED

WARNING: Disconnect electrical power from unit before beginning remote control installation. Failure to do so could result in personal injury or damage to the electrical controls.

3-11/16

 

 

 

 

 

Control cutout

 

 

 

 

 

1-11/16

 

 

 

 

 

 

 

 

 

 

 

 

 

REMOTE LOCATION FOR CONTROL

NOTE: The hood is only certified for use with the supplied 30-ft . length of wire.

The control can be removed from the hood and installed in a backsplash or countertop.

A cover plate is provided to cover the opening in the hood when the control is removed.

A 30-ft . length of 4-wire cord is supplied to accommodate most installations. Because only 30-ft . of cord is provided, careful consideration must be given to the location of the remotely mounted control.

The 30-ft . cord is supplied with a connector/ converter on one end. DO NOT REMOVE the connector/converter from the 30-ft . cord. Failure to use the connector/converter with the shorter cord will prevent proper operation of the control.

NOTE: Not for telecommunication (telephone) network.

The cord must be routed through the holes in the insert sleeve, and the rubber grommets put into place around the cord.

NOTE: On the ZVC30 and ZVC36 models, the cord needs to be routed through the holes in the insert sleeve before the damper plate is installed.

Route the cord through the conduit to reach the installation location of the control.

Remotely Mounted Control—Wall or Countertop Installation

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Long cord

 

Connector/ Short cord

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Display board

 

converter

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Main

PCB

15

Image 15
Contents Installation Instructions Read these instructions completely and carefully Installation InstructionsFor Monogram local service in your area, call For Monogram Parts and Accessories, callOBSERVETHEFOLLOWINGa Never Pick UP a Flaming PAN-You may be burnedUse an extinguisher only if Contents Design InformationProduct Clearances ZVC30 Product DimensionsZVC36 34-1/2 ″Insert Sleeve 21-1/4″ ZVC4239-1/2″ 40-1/2″46-1/2″ ZVC48Power Supply Advance PlanningAdvance Planning Duct Fittings Flexible ductingDo not use flexible plastic ducting Open hood carton Remove the liner, foam and cardboard Installation PreparationTools and Materials Required Remove the PackagingCheck Installation Hardware Remote Mounting of the Control WiredParts Provided Ceiling ducting Wall Installation PreparationDUCTWORK, Wiring Locations Above bottom edge of insert sleeveCenter Cooktop Countertop Front view Island Installation PreparationInstallation height Plan the Location of the Hood and DuctworkRemote Location for Control Remote Mounting of the Control WiredBracket CountertopCutout opening Wall MountingInstall Hood Liner Connect Electrical Verify that power is turned off at the sourceInstall Insert Sleeve Bolts Install Damper PlateInstall Blower Motor Connect Wiring HarnessWiring Finalize Installation Install FiltersDélai d’exécution 1 à 3 heures Instructions d’installationMise EN Garde Pour une Lisez ces instructions entièrement et attentivementFeu doux ou moyen Avertissement Pour RéduireInformation de conception Table DES MatièresDégagements Dimensions DE L’APPAREIL 4 po 34-1/2 po Dimensions et spécifications en pouces Dimensions externes 8 po 46-1/2 po 38-1/2 po 13 po Planification PlanificationAlimentation Électrique ’UTILISEZ PAS de conduit en plastique flexible Raccords DE ConduitsRetrait DE L’EMBALLAGE Préparation pour l’installationLocalisez les pièces emballées avec la hotte Vérification DU Matériel D’INSTALLATIONMontage DES Commandes À Distance Câblées Pièces FourniesPréparation du mur pour l’installation ET DU CâblageConduit de ventilation de plafond De cuisson Comptoir Vue frontale Préparation pour l’installation en îlotMontage DES Commandes À Distance Câblées Positionnement DES Commandes À DistanceAvertissement Coupez Comptoir Montage MuralRemontez les languettes sur Fixez la doublure au meuble à l’aide des 6 vis fournies Etape 1 Installation DE LA Doublure DE LA HotteAvertissement Si le câblage Etape 3 Installation DE LA Gaine DE Hotte Encastrable Etape 4 Installation DU Registre À Guillotine Etape 6 Connexion DU Faisceau Électrique Etape 5 Installation DES Moteurs DE VentilateursEtape 7 Installation DES Filtres Etape 8 Finalisation DE ’INSTALLATIONRetirez le film protecteur des filtres Page Instrucciones de instalación RLea estas instrucciones por completo y con detenimientoTiempo de finalización de 1 a 3 horas Nunca Levante UNA Sartén EN LLAMAS-Usted puede quemarse SOBREUNAESTUFA,CUMPLACONLOSSIGUIENTESPUNTOSª30″ mínimo requerido 36″ máximo recomendado 36″ min Información de diseñoContenidos Espacios DEL ProductoUbicación remota del control Dimensiones DEL ProductoEl revestimiento provisto Revestimiento a medidaZVC36 La funda del encastre 39-1/2″ZVC48 Planificación previa ADVERTENCIAUna conexiónSuministro DE Energía Ashrae Accesorios Para ConductosPrecaución Use guantes para protegerse de lados afilados Quite EL EnvoltorioMontaje Remoto DEL Control CON Cables Preparación para la instalaciónPiezas Provistas Controle LAS Piezas DE InstalaciónPreparación para la instalación en pared Ubicaciones DE LOS Conductos Y CableadoConductos en el cielorraso Preparación para la instalación en isla Principal Advertencia Desconecte laMontaje Remoto DEL Control CON Cables Ubicación Remota DEL ControlMostrador DE Encimera Aplique silicona alrededor de la aberturaColoque el control dentro de la abertura Encuadre la abertura para que entre el revestimiento Paso 1 Instale EL Revestimiento DE LA CampanaADVERTENCIASi el cableado Paso 2 Conecte LA ElectricidadNota El conducto doméstico debe ubicarse a Paso 3 Instale LA Funda DEL EncastrePaso 4 Instale LA Placa DEL Regulador DE Tiro Paso 6 Conecte EL Arnés DE Cableado Paso 5 Instale EL Motor DEL VentiladorPaso 7 Instale LOS Filtros Paso 8 Finalice LA InstalaciónQuite la película protectora de los filtros Gancho Notas Notas GE Consumer & Industrial