Installing the VCN Access Concentrator 35

Front Panel ConnectionsRefer to “Preparing the Site for the VCN Access Concentrator” on page 21 before connecting the VCN AC to SuperStack II Switch 1100/3300 through the front.Figure17 disp lays the infrastructure after the VCN AC has been installed without a patch panel.

Figure17 The VCN Access Concentrator Unit Installed Without a Patch Panel

Using RJ-45 connector terminated cables, connect the VCN AC LAN ports to the Ethernet switch.
VCN AP
Flat Cable
24 RJ-45 connections
between the VCN AC
and the Ethernet
Switch
Office Connect Router T1
POWER
Ethernet
Switch
VCN AC
Punch-Down Blocks
24 wire pairs
JUHHQ
IODVKLQJ#JUHHQ
RII
#HQDEOHG/#OLQN#2.
#GLVDEOHG/#OLQN#2.
#OLQN#IDLO
6
6
7
7
9
9
8
8
:
:
;
;
<
<
43
43
44
44
45
45
4
4
5
5 6
8
4
7
:
9
;
5
46
46
47
47
48
48
49
49
4:
4:
4;
4;
4<
4<
53
53
54
54
55
55
56
56
57
57
6XSHU6WDFN#,,
66,,4433#6633
3C16980
3DFNHW
3DFNHW
6WDWXV
6WDWXV
3RZHU26HOI#7HVW
9[:[
4;[4<[
4[
46[
45[
57[
123456789101112131415161718192021222324
3
PBX
VCN AP punch-down
block PBX punch-down
block
Room
Basement
Router