Powering Up the Ethernet Switch 45
Erroneous switch addresses appear in red at the end of the Set operation.
Click OK to close the message.
If there are no errors at the end of the entire Set operation, the following
message appears:
All agents were set successfully.
Click OK to close the message.
More switch addresses can be entered in the menu after each set
operation. Previously used addresses can be removed by selecting them
and clicking Remove. You can execute any number of set operations.
When you are finished, click Close.
Powering Up the Ethernet Switch
For instructions on powering-up the SuperStack II Switch 1100/3300, see
the SuperStack II Switch 1100/3300 User Guide.
For other switches, see the corresponding user guide
Powering Up the VCN Access
Concentrator
The VCN AC does not have a power switch. It is powered-up once the
power cord is plugged into the back of the VCN AC and to the mains.
Proper Selection of
Power Cord
Review the following instructions for proper selection of the power cord
for this unit:
CAUTION: Use only the power cord supplied with this unit.
If power cord(s) were not supplied with the unit, select as follows:
For units installed in the USA and Canada: Select a flexible,
three-conductor power cord that is UL-listed and CSA certified, with
individual conductor wire size of #18 AWG, and with maximum
length of 4.5 meters. The power cord termination should be MEMA
Type 5-15P (three prong earthing) at one end and IEC appliance inlet
coupler at the other end.