28CHAPTER 2: INSTALLING THE VCN ACCESS CONCENTRATOR

Air-flow is not restricted around the unit or through the vents in the side of the switch. Make sure you provide a minimum of 2.5 cm (1 inch) clearance between the SuperStack II Switch 1100/3300 and the

VCN AC

It is recommended to have a ventilated or air conditioned room.

The VCN AC is within cable reach of both the patch panel and the SuperStack II Switch 1100/3300 for which the unit is to be attached.

Mounting the VCN Table 4 lists the accessories needed for mounting the VCN AC in the

Access Concentrator 19-inch rack. in the 19-inch Rack

Table 4 The VCN Access Concentrator Accessory Set

No.

Part

Quantity

 

 

 

1

VCN AC unit

1

 

 

 

2

19-inch brackets

2

 

 

 

3

Handles

2

 

 

 

4

Screws for handles

4

 

 

 

5

Screws for brackets

8

 

 

 

In addition to the VCN AC unit, you will find a box containing the cable kit needed to install the VCN AC.

Table 5 lists the cable kit parts.

Table 5 The Cable Kit

No.

Part

Quantity

 

 

 

1

Power Cord

1

 

 

 

2

UTP CAT-5 Patch Cords

24

 

 

 

3

Flat cables (1.5 m each) with

2

 

RJ-21 connectors

 

 

 

 

Page 28
Image 28
3Com DSA-3CV1100-02 Access Concentrator 19-inch rack. in the 19-inch Rack, VCN Access Concentrator Accessory Set