Numeric

Status

Service

Description/Comments

Display (continued)

LED

LED

 

 

 

 

 

48

OFF

ON

FLASH write failure

 

 

 

 

49

OFF

ON

Read error on Port 6

 

 

 

 

60

OFF

ON

Local DRAM exhausted

 

 

 

 

8.8.

ON

OFF

PBIST (~3 seconds)

 

 

 

 

(Blank)

OFF

OFF

PBIST lamp-off test (~.5 seconds)

 

 

 

 

L0

OFF

OFF

Load Phase 0—PROM IPL loads the FLASH

 

 

 

IPL image, (~ 1 second)

 

 

 

 

L1

OFF

OFF

Load Phase 1—FLASH IPL decompresses and

 

 

 

loads the FBIST image (~ 1 second)

 

 

 

 

(Rotating segments)

ON

OFF

FBIST lamp test (~ 2 seconds)

 

 

 

 

L2

OFF

OFF

Load Phase 2—FLASH IPL decompresses and

 

 

 

loads the ONS image (several seconds)

 

 

 

 

L3

OFF

OFF

Load Phase 3—STARTUP inventories the

 

 

 

modules in ONS image (~ 3 seconds)

 

 

 

 

L4

OFF

OFF

Load Phase 4—SYSINIT inits memory mgmt.

 

 

 

and all ONS modules (~10 seconds)

 

 

 

 

CR

OFF

ON

PathBuilder S24x, 26x, and 27x switch has

 

 

 

crashed

 

 

 

 

(Blank with flashing

OFF

OFF

Normal system operation

dashes)

 

 

 

 

 

 

 

Note

During a warm start, display sequencing starts with the “L2” code.

C-2

PathBuilder S24x, 26x, and 27x Switch Error Codes

Page 146
Image 146
3Com S24x, S27x, S26x installation manual Numeric Status Service Description/Comments