
Installing a T1 or E1 Dual Port Digital PBX Interface Card
Installation | Follow these steps to install the T1/CSU Daughter card. | |
Procedure |
|
|
| Step | Action |
|
|
|
| 1 | Power down the PathBuilder S200 series switch by unplugging the AC |
|
| power plug. |
|
|
|
| 2 | Remove the cables from the rear of the T1 Dual Port Interface card. |
|
|
|
| 3 | Remove the cover from the PathBuilder S24x, 26x, and 27x switch as |
|
| shown in Figure |
|
|
|
| 4 | Use a screw driver to loosen the bracket screw and remove the T1 Dual |
|
| Interface card. |
|
|
|
| 5 | Place the card on an antistatic mat. |
|
|
|
| 6 | Locate the pin connectors on the T1 Dual Port Card. See Figure |
|
| The upper connectors support Port 49 and the lower connectors support |
|
| Port 50. |
|
|
|
| 7 | Using a pair of |
|
| small jumpers from the connectors. |
|
|
|
| 8 | Carefully insert the T1/CSU Daughter Card(s) into the pin connectors. |
|
| Ensure that the card is seated securely. |
|
|
|
| 9 | Insert the T1 Dual Port card into expansion slot 8, aligning the card with |
|
| the card guides and making proper connection on the motherboard. |
|
| Ensure that the card is seated securely. |
|
|
|
| 10 | Secure the card to the chassis using the bracket screw. |
|
|
|
| 11 | Replace the PathBuilder S24x, 26x, and 27x switch cover. |
|
|
|
| 12 | Reconnect the cables to the T1 Dual Port card. |
|
|
|
| 13 | Plug in the AC power cord. |
|
|
|
PathBuilder S24x, 26x, and 27x Switch Hardware Installation |