3Com S24x, S27x, S26x installation manual Step Action Description

Models: S24x S26x S27x

1 156
Download 156 pages 45.33 Kb
Page 65
Image 65

Installing the PathBuilder S24x, 26x, and 27x Switch in an Equipment Rack

Step

Action

 

 

Description

 

 

 

 

6

Remove the long (#6) screws.

 

The PathBuilder S24x, 26x, and

 

Then, slide the PathBuilder S24x,

 

27x switch is now securely

 

26x, and 27x switch flush against

 

attached to the equipment rack and

 

the rear flange of the Mounting

 

ready for connection to devices and

 

Shelf and reinsert the screws

 

power.

 

through the flange and into the

 

 

Note

 

 

 

unit’s case.

 

 

 

 

The unit is now accessible mainly

 

 

 

 

 

 

from the front and will require

 

 

 

complete removal from the rack to

 

 

 

perform maintenance routines.

 

 

 

 

 

Preparation and Unpacking

2-9

Page 65
Image 65
3Com S24x, S27x, S26x installation manual Step Action Description