3 Upgrading the system

35

Upgrading the system

37

Installation precautions

37

Opening the server

39

Before opening the server

39

To open the front bezel

39

To remove the front bezel

39

To remove the side panel

41

Configuring the Hot Plug HDD cage

43

To remove the Hot Plug HDD cage

43

To install a hard disk into the carrier

45

To install the Hot Plug HDD cage

46

Configuring the non-Hot Plug HDD cage

49

To remove the cage

49

To install a hard disk into the cage

50

To install the cage

51

Installing and removing storage devices

52

To remove a 5.25-inch storage device

52

To install a 5.25-inch storage device

53

Upgrading the CPU

55

To remove a CPU with heatsink

55

Processor Sequence

56

To install a CPU with heatsink

56

Upgrading the system memory

59

To remove a DIMM

60

To install a DIMM

60

Replacing the Backup Battery

62

Installing an expansion card

64

To install an expansion card

64

Installing a redundant power supply module

66

To install a redundant power supply module

67

4 BIOS setup

69

BIOS setup

71

Entering BIOS setup

72

Main

74

Advanced

76

Processor Summary and Configuration

77

IDE Configuration

78

Floppy Configuration

83

Super I/O Configuration

84

USB Configuration

85

PCI Configuration

87

Page 8
Image 8
Acer G520 series manual Upgrading the system, Bios setup