1Introduction to the L4400 Series LXI Instruments

If center- facing columns with holes are present on the frame, insert a clip- on nut on the hole perpendicular to the center hole on the front facing column. See Figure 1- 3.

back of rack

center-facing colums

insert clip nuts

on first and third

holes between indicators

(center of rack)

rail “channel

insert clip nut

if column present

insert clip nuts

between rack unit

indicators

front-facing colums

Figure 1-3. Rack Column and Shelf Rail Orientation.

2.With the rail “channel” facing the center of the rack, connect the rail to the front facing column using a 10- 32 flathead screw (item 4) and the center clip- on nut on the front- facing column. Repeat for the rail on the opposite column. Ensure the rail channel faces the center of the rack.

If the rack has center- facing columns (Figure 1- 3), insert a 10- 32 pan head screw through the rail opening and clip nut (perpendicular to the front- facing column). Repeat for the rail on the opposite column.

3.On the rack’s rear- facing columns, insert clip- on nuts on the first and third holes between the EIA unit indicators that are at the same vertical position as the indicators on the front- facing columns.

4.Attach the rear brackets to the rail ends using two 10- 32 pan head screws (item 3) and two 10- 32 nuts with lockwashers (item 6) per rail. Adjust the bracket along the rail until the bracket end aligns with (covers) the rack’s rear- facing columns. Tighten the 10- 32 pan head screws to firmly connect the bracket to the rail and maintain the rail length.

Connect the rail brackets to the rear- facing columns using two 10- 32 pan head screws per column.

8

L4400 User’s Guide

Page 18
Image 18
Agilent Technologies L4400 manual Rack Column and Shelf Rail Orientation