D-Link DWS/DXS-3200 manual Booting the Switch

Models: DWS/DXS-3200

1 372
Download 372 pages 43.39 Kb
Page 34
Image 34

Initial Configuration

Booting the Switch

As the switch boots, the bootup test first counts the device memory availability and then continues to boot. The fol- lowing screen is an example of the displayed POST.

------ Performing the Power-On Self Test (POST)

------

UART Channel Loopback Test

PASS

Testing the System SDRAM

PASS

Boot1 Checksum Test

PASS

Boot2 Checksum Test

PASS

Flash Image Validation Test

PASS

BOOT Software Version x.x.x.xx Built 07-Jan-200x 10:53:05

Processor: xxxxxx xxxxx xxxx, xx MByte SDRAM.

I-Cache 8 KB. D-Cache 8 KB. Cache Enabled.

Autoboot in 2 seconds - press RETURN or Esc. to abort and enter prom.

The boot process runs approximately 30 seconds.

The auto-boot message that appears at the end of POST (see the last lines) indicates that no problems were encountered during boot.

During boot, the Startup menu can be accessed if necessary to run special procedures. To enter the Startup menu, press <Esc> or <Enter> within the first two seconds after the auto-boot message is displayed. For information on the Startup menu, see "Startup Menu Functions."

If the system boot is not interrupted by pressing <Esc> or <Enter>, the system continues operation by decom- pressing and loading the code into RAM. The code starts running from RAM and the list of numbered system ports and their states (up or down) are displayed.

Page 33

Page 34
Image 34
D-Link DWS/DXS-3200 manual Booting the Switch