CONNECTING THE FEEDER CABLE
To connect the feeder cable to the cooker it is necessary to:
■Remove the 6 screws that hold shield A behind the cooker.
■Open completely the cable clamp D.
■Position the U bolts onto terminal block B (fig. 1.1 - 1.2).
■Insert the feeder cable into the cable save P. The supply cable must be of a suitable size for the current requirements of the appliance.
■Connect the phase and earth cables to terminal B.
■Pull the feeder cable and block it with the cable clamp D
■
N.B. The earth conductor must be left about 3 cm longer than the others.
Figure 1.1
B |
A |
D |
P |
6 |
FEEDER CABLE SECTION type “H05RR-F”
3 x 6 mm2 (**) | |||
230 | V3 | 4 x 4 mm2 | (**) |
400 | V 3N | 5 x 2,5 mm2 (**) | |
400 | V 2N | 4 x 4 mm2 | (**) |
(**)– Connection with wall box con- nection
–Diversity factor applied
Figure 1.2
230 V - 240 V
1 | 2 | 3 | 4 | 5 |
|
|
|
| |||||
|
|
|
| ||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| L1 |
|
| N (L2) PE | |||||||||
230 V3 - 240 V3 | |||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
| 1 | 2 | 3 | 4 | 5 |
|
|
|
|
| |||||
|
|
|
|
|
| ||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| L1 |
|
| L2 L3 PE | |||||||||
400 V 3N - 415 V 3N | |||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
| 1 | 2 | 3 | 4 | 5 |
|
|
|
|
| |||||
|
|
|
|
|
| ||||||||||
|
|
|
|
|
|
|
|
|
| ||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| L1 L2 L3 |
|
| N PE | |||||||||||
400 V 2N - 415 V 2N | |||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
| 1 | 2 | 3 | 4 | 5 |
|
|
|
|
| |||||
|
|
|
|
|
| ||||||||||
|
|
|
|
|
|
|
|
|
|
|
| ||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| L1 |
|
| L2 |
|
| N PE |