Instruction Manual
Oxymitter 4000
b. Oxymitter 4000 (with Integrally Mounted | (i) Allow the unit to cool to a comfort- | |||
SPS 4000) |
| able working temperature. | ||
1. Remove. | 2. Replace. | |||
(a) | Turn off power to the system. | (a) | Bolt the Oxymitter 4000/SPS 4000 | |
|
|
| assembly to the stack and install | |
(b) | Shut off the calibration gases at |
| insulation. | |
| the cylinders and the instrument | (b) | Follow the instructions in para- | |
| air. | |||
|
|
| graph | |
(c) | Disconnect the instrument air and |
| age and signal leads to an Oxy- | |
| mitter 4000/ SPS 4000 assembly. | |||
| calibration gas lines from the SPS |
| ||
| 4000. If the instrument air does not | (c) Follow the instructions in para- | ||
| flow through the SPS 4000, dis- | |||
| connect the instrument air directly |
| graph | |
| at the Oxymitter 4000. |
| tion gases and instrument air to an | |
|
|
| Oxymitter 4000/SPS 4000 assem- | |
(d) | Remove the screws securing the |
| bly. Turn on the calibration gases | |
| at the cylinders and turn on instru- | |||
| terminal cover to the SPS 4000 |
| ||
|
| ment air. | ||
| manifold. Remove the terminal |
| ||
| cover to expose the terminal strip. | (d) | Restore power to the system. | |
|
| |||
(e) | Tag all |
| ||
| are connected to the terminal strip | |||
| before removing. | Each of the following procedures details how to | ||
|
| |||
(f) | On the terminal strip, loosen the | remove and replace a specific electronic com- | ||
ponent of the Oxymitter 4000. | ||||
| screws securing the customer- | |||
|
|
| ||
| wired LINE IN and NEUTRAL |
| NOTE | |
| leads to terminals L and N (Figure |
| ||
|
|
| ||
| Recalibration is required whenever | |||
| wired ground lead from the ground | electronic cards or sensing cell is re- | ||
| lug. Remove the leads from the | placed. |
| |
| terminal strip and slide them from | a. Entire Electronics Replacement | ||
| the manifold through the line volt- | |||
| age conduit port. | (with Housing) | ||
(g) | Next, loosen the screws of remote |
| NOTE | |
| contact input terminals 1 and 2; 4- | Only perform this procedure on Oxy- | ||
| 20 mA terminals 3 and 4; and relay | mitter 4000 units without integrally | ||
| output terminals 7, 8, 9, and 10. | mounted SPS 4000 units. If it is neces- | ||
| Remove the leads from the termi- | sary to replace the entire electronics | ||
| nal strip and slide them from the | on an Oxymitter 4000/ SPS 4000 as- | ||
| manifold through the signal conduit | sembly, contact Rosemount for further | ||
| port. | instructions. | ||
(h) | Remove insulation to access the | 1. Follow the instructions in paragraph | ||
| mounting bolts. Unbolt the Oxy- | |||
| mitter 4000/SPS 4000 assembly | from the stack or duct. If removing an | ||
| from the stack and take the entire | Oxymitter 4000/SPS 4000 assembly, | ||
| assembly to a clean work area. | follow the instructions in paragraph | ||
|
|
Rosemount Analytical Inc. A Division of Emerson Process Management |