Configuration Guidelines

Configuration Guidelines

The NAC Controller PEPs for the Enterasys NAC Controller are equipped with a firmware‐based management tool, which provides the capability to configure the NAC Controller PEP and access chassis, power supply, and fan information.

LANVIEW LEDs

The following sections describe the LANVIEW LED indications for the following:

Enterasys NAC Controller power supplies

Enterasys NAC Controller fans

Power Supply LEDs

There are two power supply LEDs on the front panel of the chassis, one for each power supply. Refer to Figure 2‐1 for the location of the power supply LEDs. Table 2‐1 describes the different states of the power supply LEDs under different conditions.

Figure 2-1 Power Supply LEDs

12

7C111

N1

1 PS1 LED2 PS2 LED

Table 2-1 Power Supply (PS) LED Status Definitions

Condition

PS1

PS2

PS1 LED

PS2 LED

 

 

 

 

 

1

ON

ON

Green

Green

 

 

 

 

 

2

ON

OFF

Green

Red

 

 

 

 

 

3

OFF

ON

Red

Green

 

 

 

 

 

2-2 Installation Requirements and Guidelines

Page 30
Image 30
Enterasys Networks 7S4280-19-SYS, 2S4082-25-SYS manual Configuration Guidelines, Lanview LEDs, Power Supply LEDs, Condition