Manuals
/
Enterasys Networks
/
Computer Equipment
/
Computer Hardware
Enterasys Networks
2S4082-25-SYS, 7S4280-19-SYS
manual
Enterasys
Models:
2S4082-25-SYS
7S4280-19-SYS
1
1
108
108
Download
108 pages
63.46 Kb
1
2
3
4
5
6
7
8
<
>
Troubleshooting
Specs
Install
Connecting to the Network
Configuration Guidelines
Lanview Diagnostic LEDs
Mini-GBIC with LC Connector
Recommended Shutdown Procedure
Parameter Setting
How to
Page 1
Image 1
Enterasys
®
NAC Controller
Hardware Installation Guide
2S4082-25-SYS
7S4280-19-SYS
P/N 9034376
Page 2
Page 1
Image 1
Page 2
Contents
Enterasys
Page
Page
Regulatory Compliance Information
Electromagnetic Compatibility EMC
Supplement to Product Instructions
Vcci Notice
Enterasys NETWORKS, INC. Firmware License Agreement
Vii
Viii
Contents
Troubleshooting
NAC Controller PEP Installation
Appendix a Specifications and Regulatory Compliance
Initializing the NAC Controller
Figures
Index
Tables
MGBIC-08
Xiv
About This Guide
How to Use This Guide
Who Should Use This Guide
For Refer to
Related Documents
Commonly Used Acronyms
Typographical Conventions
Getting Help
Overview
Introduction
NAC Controller PEP
N1-7C111 Chassis
Overview
2S4082-25 NAC Controller PEP
2S4082-25 NAC Controller PEP
7S4280-19 NAC Controller PEP
7S4280-19 NAC Controller PEP
Power Supply Lanview LEDs
Redundant Power Supplies
Power Supply Status Through System Management
Auto-Ranging Power Supplies
Secure Networks Policy Support
Lanview Diagnostic LEDs
Standards Compatibility
Standalone or Rack Mountable Chassis
Lanview Diagnostic LEDs Introduction
Site Guidelines
Installation Requirements and Guidelines
Power Supply LEDs
Configuration Guidelines
Power Supply PS LED Status Definitions
Lanview LEDs
Fan LED
NAC Controller PEP Network Requirements
Fan LED States and Definitions
LED Color Status
10BASE-T Network
Link Aggregation
100BASE-TX Network
1000BASE-T Network
1000BASE-SX/LX/ELX Network
Page
Unpacking the Enterasys Matrix N1 Chassis
Enterasys Matrix N1 Chassis Setup
Installing the Chassis on a Flat Surface
Setting Up the Enterasys Matrix N1 Chassis
Order of Installation
Quantity
Installing the Rubber Feet
Installing the Chassis into a Rack
Installing the Chassis on the Rack Shelf
Attaching the Electrostatic Discharge Wrist Strap
Installing the Chassis Directly to the Rack
ESD Grounding Receptacle
Powering Up a Enterasys Matrix N1 Chassis
Cooling Fans
Connecting the 15-Amp AC Power Cords
Required Tools
NAC Controller PEP Installation
Unpacking the NAC Controller PEP
Important Notice
Contents of Module Carton Quantity
Installing Optional Mini-GBICs
Installation
Mini-GBIC with LC Connector
Removing the Mini-GBIC
Installing NAC Controller PEP into the Matrix N1 Chassis
Preparation
Installation
Connecting UTP Cables to the 2S4082-25
Connecting to the Network
N1 Chassis slot Metal back panel FTM2 backplane connectors
NAC Controller PEP card
RJ45 connector RJ45 port connector port Group Select button
Connecting a Twisted Pair Segment to the NAC Controller PEP
RX+
TX1+ RX1 TX2+ TX3+ RX3 RX2 TX4+ RX4
Connecting Fiber-Optic Cables to Mini-GBICs
10 Cable Connection to MT-RJ Fiber-Optic Connectors
11 Cable Connection to LC Fiber-Optic Connectors
What Is Needed
Connecting to COM Port for Local Management
Connecting to an IBM PC or Compatible Device
Parameter Setting
12 Connecting an IBM PC or Compatible
Connecting to a VT Series Terminal
13 Connecting a VT Series Terminal
Connecting to a Modem
COM Port Adapter Wiring and Signal Diagram
Adapter Wiring and Signal Assignments
RJ45
VT Series Port Adapter Wiring and Signal Diagram
Completing the Installation
Modem Port Adapter Wiring and Signal Diagram
RJ45 DB25
First-Time Log-In Using a Console Port Connection
15 Matrix DFE Startup Screen Example N7 Chassis
Using Lanview
Troubleshooting
About the Management Mgmt LED
Viewing the Receive and Transmit Activity
Lanview LEDs for the 7S4280-19
Lanview LEDs for the 2S4082-25
Color State Recommended Action
Lanview LEDs
Alternating 67% on, 33% off
Series Configuration Guide for proper setup
Troubleshooting Checklist
Problem Possible Cause Recommended Action
Troubleshooting Checklist
OFFLINE/RESET Switch for the 2S4082-25
Overview of the NAC Controller PEP Shutdown Procedure
Last Resort Shutdown Procedure
Recommended Shutdown Procedure
Page
Initializing the NAC Controller
NAC Controller Ports
Layer 3 NAC Controller Positioning
General Management Considerations
Layer 2 In-Band Management Topology
Layer 2 Out-Of-Band Management Topology
Layer 3 Out-Of-Band Management
Preparation for NAC Controller Initialization
Choose NAC Controller Installation Type
NAC Controller Initialization Procedure
Enter the Management Vlan ID
NAC Controller Initialization Procedure
12 Setup NAC Controller PEP Networking
13 Enter NetSight Server IP Address
16 Configure System Date and Time
17 Set the System Date
19 Select the UTC/Local Hardware Clock Setting
21 Enable an Snmp Daemon
Setup the Vlan Configurations
NAC Controller Policy Configuration
NAC Controllers Require Separate Domains
24 Determining NAC Controller Mode of Operation
25 Import From Device Wizard
Modifying NAC Controllers Preconfigured Policy
26 Import From Device Wizard
Adding Assessment Classification Rules
28 Services Screen
Modifying the Downstream Default Policy
Page
7C111 Chassis Specifications and Regulatory Compliance
Specifications and Regulatory Compliance
Physical Specifications
Table A-1 Chassis Specifications Physical
Environmental Requirements
Power Supply
Regulatory Requirements
Table A-5 NAC Controller Engine Specifications Ports
NAC Controller Engine Interface Specifications
External Power Supply
Processor/Memory
Table A-6 COM Port Pin Assignments Signal Name Input/Output
Table A-5 NAC Controller Engine Specifications
NAC Controller Engine COM Port Pinout Assignments
Environmental
Table A-7 Specifications for 2S4082-25
NAC Controller PEP 2S4082-25 Module Specifications
Ports
Processors/Memory
Table A-8 COM Port Pin Assignments Signal Name Input/Output
NAC Controller PEP 7S4280-19 Specifications
Table A-9 Specifications
2S4082-25 COM Port Pinout Assignments
Table A-10 Mini-GBIC Input/Output Port Specifications
Mini-GBIC Input/Output Specifications
7S4280-19 COM Port Pinout Assignments
MGBIC-LC01/MGBIC-MT01 Specifications 1000BASE-SX
Gigabit Ethernet Specifications
MGBIC-LC03 Specifications 1000BASE-SX
MGBIC-08 Specifications 1000BASE-ELX
MGBIC-LC09 Specifications 1000BASE-LX
Table A-20 MGBIC-02 / Specifications
MGBIC-02 Specifications 1000BASE-T
Regulatory Compliance
Table A-21 Compliance Standards
Setting the Mode Switches
Mode Switch Bank Settings Optional Installations
Location of Memory Modules
Memory Locations and Replacement Procedures
Connector arms
Flash Dimm Replacement Procedure
Connector fingers
Flash Dimm
Figure B-4 Installing the Dimm
Installing the Dimm
Installing the Dram Simm
Dram Simm Replacement Procedure
Connector contacts
Removing the Dram Simm
Dram Simm alignment notches
Dram Simm Connector arms Connector contacts
Numerics
Index
Index-2
Top
Page
Image
Contents